BLD-Final | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Tony Young
|
|
|
Screeened- Robert Phone #: ###-####
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | DONE |
Tony Young
|
|
|
Screeened- Robert Phone #: ###-####/// 4.0
|
BLD-Energy code compliance | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | PEND |
Tony Young
|
|
|
Robert Phone #: ###-####// needs sprinklers 1st
|
BLD-Energy code compliance | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PART |
Tony Young
|
|
|
fire // robert Phone #: ###-####// frame walk through.. needs fire sprinkler pass
|
BLD-Framing/Rough-in | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | NR |
Tony Young
|
|
|
Robert *screened* Phone #: ###-####// needs fire sprinklers,, ok to cover soffits
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | NR |
Tony Young
|
|
|
Robert *screened* Phone #: ###-####// fire sprinklers are required
|
BLD-Other | 5/4/2020 | 5/5/2020 | 5/6/2020 | P | PEND |
Tony Young
|
|
|
Screened- soffit Robert Phone #: ###-####,, pending electrical pass
|
BLD-Other | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PART |
Tony Young
|
|
|
Screened- siding combustible exterior materials need to be inpsected- Robert Phone #: ###-####// siding ok
|
BLD-Wall Bracing | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Tell Riley
|
|
|
Robert **Cleared** Phone #: ###-####
|
BLD-Foundation | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Tell Riley
|
|
|
Nick Phone #: ###-####//Setbacks still appear to meet minimums//need to add 1 row rebar in wall at garage openings//WIP//
|
BLD-Footing | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | PART |
Tell Riley
|
|
|
Nick Phone #: ###-####//front setback at 29 feet, per Sue in zoning only needs 20 feet//side setbacks appear to meet minimums// footings ok//
|
Issue PAID IN FULL permit | | | 3/2/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2020 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2020 | | DONE |
|
|
|
called and left a message for applicant that the permit is ready for pickup and what fees are due.
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
met
|
Routing - PLANNING | 1/23/2020 | | 2/26/2020 | | FAIL |
Sue Cummings
|
|
|
Driveway and property lines are shown improperly.
|
Plan assigned to (RDP) | 1/22/2020 | 1/22/2020 | 2/25/2020 | | DONE |
Rob Patrick
|
|
|
Resub 02/28: 2nd Review Completed 02/19 Failed...1st Review Complet 02/10 sfd L2 PAPER...02/13 Failed
|
Routing - PLAN CHECK | 2/25/2020 | | 2/25/2020 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 2/25/2020 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2020 | | DONE |
Rob Patrick
|
|
|
|
Plan resubmittals received | | | 2/24/2020 | | DONE |
|
|
|
Two Copies Shear Wall Resubmittal Sheet 4.
|
Plan resubmittals received | | | 2/19/2020 | | DONE |
|
|
|
Two copies of each whole new plans stamped and taken to plan reviewer.
|
Routing - PLAN CHECK | 2/19/2020 | | 2/19/2020 | | FAIL |
Rob Patrick
|
|
|
2nd Review Completed: 02/19 Failed
|
1st review completed | | | 2/13/2020 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 2/10/2020 | | 2/13/2020 | | FAIL |
Rob Patrick
|
|
|
1st Review Complete: 02/13 Failed Corrections Req'd
|
Routing - PLANNING | 2/12/2020 | | 2/12/2020 | | PASS |
Sue Cummings
|
|
|
New site plan received 2/12/2020. O.K. now
|
Routing - FIRE | 2/11/2020 | 2/11/2020 | 2/11/2020 | | PASS |
Mark Stumbaugh
|
|
|
Fire Sprinklers required
|
Plan resubmittals received | | | 2/4/2020 | | DONE |
|
|
|
resubmittal received from Robert from Rainbow Construction. 2 full sets
|
Routing - FIRE | 1/24/2020 | 1/23/2020 | 1/27/2020 | | FAIL |
Lee G Meredith
|
|
|
New SFH
Resubmittal required. Currently, all access distances have been exceeded. Sprinklers may be required.
|
Routing - MECHANICAL | 1/23/2020 | | 1/24/2020 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 1/22/2020 | 1/25/2020 | 1/23/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 1/23/2020 | | 1/23/2020 | | FAIL |
Sue Cummings
|
|
|
Site plan does not match the lot
|
Routing PW Flood Plain | 1/23/2020 | | 1/23/2020 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####
|
Routing - Addressing | 1/22/2020 | | 1/23/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2020 | | 1/23/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 1/22/2020 | | PASS |
|
|
|
|
Application received | | 1/22/2020 | | | |
|
|
|
|