BLD-Framing/Rough-in | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. Exterior walls ok to cover exterior side.
|
BLD-Framing/Rough-in | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. Exterior walls
|
BLD-Foundation | 7/6/2020 | 7/7/2020 | 7/7/2020 | P | PART |
Tell Riley
|
|
|
We would like to place walls at handicap ram and stairs at 1:30 pm Phone #: ###-#### Inspection requested via web by John Saucerman//appears to be ok for walls//18" 90s were not installed at time of inspection for the capped slab//contractor stated they epoxy the 90s in--let him know the desing would need to be an approved change//pending all special inspections required//
|
BLD-Foundation | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | CANC |
Mike Jordan
|
|
|
Would like to place 2 columns next to existing building at 10:30 am. Phone #: ###-#### Inspection requested via web by John Saucerman. concrete pilasters against existing columns.
|
BLD-Footing | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PART |
Mike Jordan
|
|
|
AM inspection would like to place concrete at 10:30 am Phone #: ###-#### Inspection requested via web by John Saucerman. ADA ramp, interior column pad footings and exterior stairs. Ok pending special inspection.
|
BLD-Energy code compliance | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Foundation | 6/12/2020 | 6/15/2020 | 6/15/2020 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. perimeter walls, work in progress. ok pending special inspection.
|
BLD-Footing | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. Perimeter footings ok. Will olaso hace special inspection.
|
BLD-Framing/Rough-in | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | PASS |
Mike Jordan
|
|
|
please call 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|
Inspection Record Card- Bld | | | 4/27/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/22/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/20/2020 | | |
|
|
|
|
Plan assigned to (CDM) | 3/20/2020 | 3/20/2020 | 4/20/2020 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2020 | | DONE |
|
|
|
ALL MET email greg@saucermanci.com
Need
GC Form
Revised Cert of Value
MET
ACHD
Rp
|
Routing PW Drainage | 4/17/2020 | | 4/17/2020 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Drainage | 4/16/2020 | | 4/16/2020 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in eplan. Jason Taylor ###-####
|
Routing - PLAN CHECK | 4/3/2020 | | 4/10/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 4/3/2020 | | 4/9/2020 | | PASS |
Michael Zawacki
|
|
|
RP needed
|
Routing PW Drainage | 4/6/2020 | | 4/6/2020 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing PW Street Lights | 4/3/2020 | | 4/3/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 4/3/2020 | | 4/3/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 3/31/2020 | 4/3/2020 | 4/1/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/19/2020 | 2/19/2020 | 3/31/2020 | | PASS |
Greg Ruxton
|
|
|
Comments attached to case.
|
1st review completed | | | 3/31/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/19/2020 | | 3/30/2020 | | FAIL |
Michael Zawacki
|
|
|
Needs an ESC narrative
|
Plan assigned to (CJW) | 2/19/2020 | 2/19/2020 | 3/20/2020 | | DEFR |
Carl Westfall
|
|
|
9 - 03/18/20 (New Building - 25 days) (eplan - 46 sheets) Executive Warehouse New
|
Routing - PLAN CHECK | 2/19/2020 | | 3/20/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 2/19/2020 | | 3/3/2020 | | PASS |
Carl Westfall
|
|
|
KPFF
|
Routing PW Drainage | 2/19/2020 | | 3/2/2020 | | FAIL |
Brian Murphy
|
|
|
needs shallow injection well form
|
Routing PW Solid Waste | 2/19/2020 | | 2/24/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - MECHANICAL | 2/19/2020 | | 2/24/2020 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 2/19/2020 | | 2/24/2020 | | FAIL |
Katelyn Menuge
|
|
|
Need bicycle racks shifted farther west to ensure bicycle do not impede the sidewalk. Need shrubs/plantings indicated in new landscape planter.
|
Routing PW Environmental | 2/19/2020 | | 2/21/2020 | | PASS |
Rick Christenson
|
|
|
Approved for shell only. Tenants must pass Pretreatment review.
|
Routing PW Street Lights | 2/19/2020 | | 2/20/2020 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLANNING | 2/19/2020 | | 2/20/2020 | | PASS |
Nicolette Womack
|
|
|
Allowed use, see DR for exterior modifications
|
Routing - Addressing | 2/19/2020 | | 2/20/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2020 | | 2/20/2020 | | PASS |
Candy A. Nichols
|
|
|
NEW
|
Routing PW Sewer Design | 2/19/2020 | | 2/19/2020 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/19/2020 | | 2/19/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 2/13/2020 | | PASS |
|
|
|
|
Intake Approval | | | 1/31/2020 | | FAIL |
Michael Hanson
|
|
|
01/31/2020
Provide site specific fire flow letter indicated on #502 checklist
Sheet index needs reviewed and corrected.
Missing sheet S5.1 indicated on #502 checklist and index for wall framing and bracing
Floor plan and structural plan show incomplete note for dock leveler, submitted plans must be ready for construction set.
Resolve for the above comments to pass prescreen.
|
Intake Approval | | | 1/28/2020 | | FAIL |
Michael Hanson
|
|
|
COMMERCIAL ADDITIONS SHALL BE APPLIED FOR UNDER A #502 APPLICATIONS - RESUBMIT WITH #502 APPLICATION, CHECKLIST, AND REQUIRED DOCUMENTATION.
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 9:25AM
|