Permit Information
Permit NumberBLD20-00219
StatusIssued
Name 208 NORTHWEST CONSTRUCTION LLC
Site Address 8055 W GODDARD RD
Project NameCapital HS Concession-Pressbox
Customer Number 
ePlanReviewYes
Description
(CAPITAL HIGH SCHOOL CONCESSION/PRESSBOX) **EXPEDITED REVIEW** Permit for demolition of existing overhang structure at back of bleachers and construction of new 2-story, 234 square foot wood-framed outbuilding for Capital High School's softball field to contain concessions on the first floor and a press box above on the second floor. Scope of work includes related site work as shown on approved plans including accessible route. Special inspection required per attached Form 310. All work per approved plans and Engineering. This building is NOT fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval8/6/20208/6/20208/6/2020 DONE
DetailsTiffany Lowery
BLD-Final7/31/20207/31/20207/31/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//see correction notice//need public works sign off as well//
FIRE-Final Inspection7/29/20207/29/20207/30/2020PPASS
DetailsTroy Cobbley
life safety passed. Phone #: ###-#### Inspection requested via web by Ted Perry
Zoning Approval7/29/20207/29/20207/29/2020 DONE
DetailsEthan Mansfield
Looks good for zoning!
BLD-Final7/28/20207/28/20207/28/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//need zoning and fire life safety finals prior to building final//
BLD-Energy code compliance6/18/20206/18/20206/18/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//insulation--architect changed and Ted will send email//1" closed cell foam-R7 and R15 batts in wall//room 2" closed cell foam R14 and R15 batts//ok pending architects letter//stairs still under constrution and will be as built by engineer--per Ted//trades ok--no mechanical was installed--let Ted know to contact plan review to remove from requirements//
BLD-Framing/Rough-in6/12/20206/12/20206/12/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//1st floor ok, 2nd floor needs a35s installed-Ted will take photos//ted said nailing on exterior was completed prior to siding going on//ok to insulate//stairs still a WIP, need details from engineer//
BLD-Framing/Rough-in6/2/20206/3/20206/3/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//cn left onsite with contracor//see details for framing//add nails and a35s for shear per plan//need alt design for stairs and landing as they do not reflect plans//
BLD-Framing/Rough-in6/2/20206/2/20206/2/2020PCANC
DetailsTell Riley
BLD-Framing/Rough-in6/1/20206/2/20206/2/2020ACANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry
BLD-Footing4/27/20204/27/20204/27/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ted Perry//need to have electrical sign off on ground//footings WIP, main area bar ok pending specials//piers are still being installed-WIP//pour is pending specials approval//
Telephone call  4/17/2020 DONE
emailed the architect to see if she may have a better email, jeff's doesn't work, so i can let the GC know the rp expired in 2015 and need another name
Print Occupancy Form  4/17/2020 DONE
Issue PAID IN FULL permit  4/17/2020 DONE
Telephone call  4/8/2020 DONE
emailed project engineer, Jeff Homan and let him know that the GCs license has expired and we cannot issue the permit until they have renewed.
OVERRIDE  4/2/2020  
Plan assigned to (JAR)2/13/20202/13/20204/2/2020 DONE
DetailsJulie Romig
04/03 - 3rd Rev - 1st Rev Comp - **EXPEDITED SCHOOL REVIEW** Capital HS Concession/Pressbox
Routing Off Site - STRUCTURAL4/1/2020 4/2/2020 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  4/2/2020 DONE
Permit Ready to Issue  4/2/2020 DONE
RP EXPIRED 2015


MET: jeff@morganind.com
GC
NEED
RP
Routing - PLAN CHECK4/1/2020 4/2/2020 PASS
DetailsJulie Romig
Routing - FIRE4/1/20204/1/20204/1/2020 PASS
DetailsGreg Ruxton
Comments attached to case.
Routing - ELECTRICAL4/1/2020 4/1/2020 PASS
DetailsJavier Guzman
Routing - FIRE3/18/20203/18/20203/24/2020 FAIL
DetailsGreg Ruxton
Attached comments to case and emailed architect.
Routing - PLAN CHECK3/18/2020 3/24/2020 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL3/18/2020 3/23/2020 FAIL
DetailsJulie Romig
AHJ
Routing - PLANNING3/18/2020 3/20/2020 PASS
DetailsEthan Mansfield
Routing - ELECTRICAL3/18/2020 3/18/2020 FAIL
DetailsDaryl DeGrange
Route to Impact Fee Review2/26/20202/29/20202/27/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  2/26/2020 DONE
DetailsJulie Romig
Routing - PLAN CHECK2/13/2020 2/26/2020 FAIL
DetailsJulie Romig
Routing - FIRE2/12/20202/13/20202/25/2020 FAIL
DetailsGreg Ruxton
Comments attached to case. Emailed architect.
Routing Off Site - STRUCTURAL2/13/2020 2/22/2020 PASS
DetailsJulie Romig
AHJ
Routing PW Solid Waste2/13/2020 2/18/2020 PASS
DetailsEvan Carpenter
Routing PW Environmental2/13/2020 2/18/2020 PASS
DetailsRick Christenson
Routing - MECHANICAL2/13/2020 2/18/2020 PASS
DetailsChad Schwendiman
Routing - PLANNING2/13/2020 2/14/2020 FAIL
DetailsEthan Mansfield
Can't pass this without the CUP Mod. I am almost done with the CUP Mod, then the 10 day appeal period must lapse. Then I can pass. Cheers,
Ethan
Routing - Addressing2/13/2020 2/14/2020 PASS
DetailsDoug Chausow
Routing PW Drainage2/13/2020 2/14/2020 PASS
DetailsBrian Murphy
LESS THAN 1000 SQFT
Routing PW Street Lights2/13/2020 2/14/2020 PASS
DetailsTom Marshall
Routing PW Sewer Design2/13/2020 2/14/2020 PASS
DetailsDeAnn Brown
Project is located in West Boise Sewer District. Any alterations to site piping and sewer connections should be coordinated with West Boise Sewer District.
Routing - PUBLIC WORKS2/13/2020 2/13/2020 PASS
DetailsCandy A. Nichols
Routing - Erosion and Sediment2/13/2020 2/13/2020 PASS
DetailsMichael Zawacki
RP needed. Small project, no prep inspection required.
Routing - ELECTRICAL2/13/2020 2/13/2020 FAIL
DetailsDaryl DeGrange
Routing - PLUMBING2/13/2020 2/13/2020 PASS
DetailsDan Ediger
Per plans and ISPC
Intake Approval  2/12/2020 PASS
DetailsJulie Romig
Intake Approval  1/30/2020 FAIL
DetailsJulie Romig
Need: 1. Verification of Legal Lot or Parcel form signed by PDS subdivision staff.
2. CDHD - provide application or stamped/approved plans per checklist for new concession stand (or email from CDH stating that no review is required).
3. Form 310 completed by structural engineer and signed by owner for all required special inspections (including those listed on S0.02)
4. Planning and Zoning Letter of Approval
5. Energy COMcheck for Building Envelope (equipment buildings are only for housing equipment and not intended for human occupancy).
Application received  1/23/2020 DONE
Application submitted via PDS Online on Jan 23 2020 11:27AM
Agreement of Future work4/21/20204/21/2025   
DetailsJoe Bruce
(CAPITAL HIGH SCHOOL) Agreement to install a code compliant fire hydrant located within code requirements of the softball pressbox/concession stand within the next 5 years in conjunction with the parking lot replacement. See agreement attached to this case.