BLD-Conference | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | CANC |
Tell Riley
|
|
|
Screened // Robert Phone #: ###-####
|
BLD-Final | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Tell Riley
|
|
|
ok when furnace conduit is sealed at the separation wall in garage--let contractor know//
|
DOC - Permit Finaled | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Tell Riley
|
|
|
|
Plan Reviewer's activity | | | 7/28/2020 | | DONE |
Debbie Sanine
|
|
|
Per Manuel J: the windows meet a .31, The walls R-Value is R21, and the Ceiling R-Value is R38.
|
BLD-Final | 7/24/2020 | 7/27/2020 | 7/27/2020 | P | FAIL |
Tell Riley
|
|
|
Robert - */Screened*/ Phone #: ###-####//plumbing inspection was canceled--need to have final complete//plans show R49 attic insulation, tag show R38 was installed//remove dust covers from smoke detectors//
|
BLD-Blower Door Test Results | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | DONE |
Tell Riley
|
|
|
5.1 ACH 50
|
BLD-Final | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | NR |
Brandon Shaw
|
|
|
Need PLm final and blower door test...
|
BLD-Framing/Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tell Riley
|
|
|
Kerry - Screened for COVID 19 symptoms Phone #: ###-####//hardware added to truss per drawings//
|
BLD-Energy code compliance | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tell Riley
|
|
|
Kerry Phone #: ###-####
|
BLD-Framing/Rough-in | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PART |
Tell Riley
|
|
|
Screened-CAREY Phone #: ###-####//install TBE6 brackets on girder//other corrections ok//ok to insulate//
|
BLD-Framing/Rough-in | 4/21/2020 | 4/23/2020 | 4/23/2020 | A | FAIL |
Tell Riley
|
|
|
Screened- Carry Phone #: ###-####//see CN posted for framing fixes//
|
BLD-Energy code compliance | 4/21/2020 | 4/23/2020 | 4/23/2020 | A | CANC |
Tell Riley
|
|
|
Screened- Carry Phone #: ###-####
|
BLD-Wall Bracing | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PART |
Tell Riley
|
|
|
No one will be onsite // Kerry Phone #: ###-####//nailing corrections made// hold downs still need to be added at portal frame//
|
BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | FAIL |
Tell Riley
|
|
|
stated no one would be onsite..... shear // Kerry Phone #: ###-####//CN issued//need to add hot dip galvanized nails in PT//need to finish nailing portal frame and add hold downs in correct location//nail areas marked in red//
|
BLD-Foundation | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok, setbacks tight on front and back//need to update plans to show no rebar in footing and wall//
|
Issue PAID IN FULL permit | | | 3/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/25/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 1/30/2020 | 1/30/2020 | 2/25/2020 | | DONE |
Debbie Sanine
|
|
|
l
|
Routing - PLAN CHECK | 2/25/2020 | | 2/25/2020 | | PASS |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 2/25/2020 | | 2/25/2020 | | PASS |
Sue Cummings
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/25/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 2/12/2020 | | 2/12/2020 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 2/4/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/30/2020 | | 2/4/2020 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 1/30/2020 | 2/2/2020 | 1/31/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 1/30/2020 | | 1/31/2020 | | FAIL |
Sue Cummings
|
|
|
The City requires the remaining portion of the common drive be improved. Please submitt a perpetual cross acces acreement between the owner of parcels A and B for access through A to access B that does not show on the ROS.
|
Routing - Addressing | 1/30/2020 | | 1/30/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/30/2020 | | 1/30/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 1/30/2020 | | 1/30/2020 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
|
|
|
|
Intake Approval | | | 1/28/2020 | | FAIL |
|
|
|
3rd Prescreen 1/28/2020: Please submit Manual J or state on plans type of HVAC being used.
|
Intake Approval | | | 1/27/2020 | | FAIL |
|
|
|
2nd Prescreen:
1. Please provide ACCA approved load calculations for HVAC system. (manual J)
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 12:18PM
|
Intake Approval | | | 1/23/2020 | | FAIL |
|
|
|
1. We are using the 2015 IRC code year. Please correct all the code information on your plans from 2012 to 2015 please.
2. Please provide a Building cross section showing a through the building from the bottom of the footing through to the roof with all required information.
3. Please provide elevations showing the height of the building.
4. Please provide the manual J.
|