BLD-Energy code compliance | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | PASS |
Tell Riley
|
|
|
screened // Vinnie Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tell Riley
|
|
|
Vinny- */Screened*/ Phone #: ###-####//ok to insulate//
|
BLD-Framing/Rough-in | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | FAIL |
Tell Riley
|
|
|
SCREENED // Vinny Phone #: ###-####//CN posted//need air seal completed and other framing corrections//
|
BLD-Wall Bracing | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Tell Riley
|
|
|
Vinny *screened* Phone #: ###-####//ok when HD galvanized nails added to Pt plate//
|
BLD-Foundation | 6/16/2020 | 6/17/2020 | 6/17/2020 | P | CANC |
Tell Riley
|
|
|
Dane *screened* Phone #: ###-####
|
BLD-Foundation | 6/15/2020 | 6/16/2020 | 6/16/2020 | P | PART |
Tell Riley
|
|
|
Screened-foundation wall Phone #: ###-####//ok//still need to remove rebar from plans//setbacks still appear to be ok//WIP//
|
BLD-Footing | 6/10/2020 | 6/15/2020 | 6/15/2020 | P | PART |
Tell Riley
|
|
|
screened // Dane Phone #: ###-####//setbacks measured, ok per plans, will need to re-verify at wall inspection//rebar in pads and at garage wall//contractor needs to have rebar on all areas removed from plans as the plans show rebar and he requested not to install rebar//WIP//mud needs to be removed in wet areas as discussed//
|
Issue PAID IN FULL permit | | | 6/5/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/12/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 1/30/2020 | 1/30/2020 | 2/12/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 2/12/2020 | | 2/12/2020 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/12/2020 | | DONE |
|
|
|
Met
|
Routing - PLANNING | 2/10/2020 | | 2/10/2020 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 2/4/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/30/2020 | | 2/4/2020 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 1/30/2020 | 2/2/2020 | 1/31/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/30/2020 | | 1/31/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/30/2020 | | 1/31/2020 | | FAIL |
Sue Cummings
|
|
|
Incorrect front and rear setbacks. Move house east 5 ft.
|
Routing - PLANNING | 1/31/2020 | | 1/31/2020 | | FAIL |
Sue Cummings
|
|
|
No changes made. Incorrect setbacks.
|
Routing - Addressing | 1/30/2020 | | 1/30/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/30/2020 | | 1/30/2020 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/30/2020 | | FAIL |
|
|
|
4th Prescreen 2/30/20: Please rotate plan sheets in the correct orientation.
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
|
|
|
|
Intake Approval | | | 1/28/2020 | | FAIL |
|
|
|
(spoke with Kerry)
3rd Prescreen 1/28/2020: Please submit Manual J or state on plans type of HVAC being used. Please rotate plan sheets in the correct orientation
|
Intake Approval | | | 1/27/2020 | | FAIL |
|
|
|
2nd Prescreen:
Please provide ACCA approved load calculation sheet for HVAC system. (manual J)
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 12:29PM
|
Intake Approval | | | 1/23/2020 | | FAIL |
|
|
|
1. We are using the 2015 IRC code year. Please correct all the code information on your plans from 2012 to 2015 please.
2. Please provide a Building cross section showing a through the building from the bottom of the footing through to the roof with all required information.
3. Please provide elevations showing the height of the building.
4. Please provide the manual J.
|