BLD-Energy code compliance | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | PASS |
Jim Storey
|
|
|
Rusty Phone #: ###-####
|
BLD-Energy code compliance | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | NR |
Jim Storey
|
|
|
screened // Rusty Phone #: ###-####
|
BLD-Energy code compliance | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | NR |
Jim Storey
|
|
|
screened // Rusty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rusty Cook
|
BLD-Wall cover | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | PASS |
Jim Storey
|
|
|
fire wall -Rusty *screened* Phone #: ###-####697
|
BLD-Framing/Rough-in | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PART |
Jim Storey
|
|
|
fire wall -Rusty *screened* Phone #: ###-####697
|
BLD-Wall Bracing | 5/8/2020 | 5/8/2020 | 5/11/2020 | P | PASS |
Jim Storey
|
|
|
Rusty *screened* Phone #: ###-####
|
BLD-Foundation | 4/17/2020 | 4/20/2020 | 4/21/2020 | P | PASS |
Jim Storey
|
|
|
screened wall // Pat Phone #: ###-####
|
BLD-Footing | 4/16/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Jim Storey
|
|
|
Screened- PAT Phone #: ###-#### garage ok
|
BLD-Foundation | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Foundation | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | NR |
Jim Storey
|
|
|
Wall // Pat Phone #: ###-####
|
BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | DONE |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 3/10/2020 | 3/11/2020 | 3/10/2020 | P | CANC |
Jim Storey
|
|
|
wall// PAT Phone #: ###-####
|
BLD-Footing | 3/6/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/3/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/3/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/2/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 2/20/2020 | 2/20/2020 | 3/2/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 3/2/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 1/24/2020 | | 3/2/2020 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 2/24/2020 | | 2/24/2020 | | PASS |
Katelyn Menuge
|
|
|
Redlined site/landscape plan.
|
1st review completed | | | 2/21/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - Addressing | 1/24/2020 | | 1/28/2020 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 1/24/2020 | 1/27/2020 | 1/27/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 1/24/2020 | | 1/27/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO IS FOR THIS ADDRESS 1710 S VERMONT AVE. BLD20-00227- EXISTING ADDRESS 1712 S VERMONT AFTER THE LOT SPLIT WILL NEED TO PROVIDE THE NEW SERVICE STUB DEMO PERMIT BLD19-04675 GOES TO BLD20-00212
|
Routing - MECHANICAL | 1/24/2020 | | 1/27/2020 | | PASS |
Troy James
|
|
|
|
Plan assigned to (BJM) | 1/24/2020 | 1/24/2020 | 1/24/2020 | | DEFR |
Brian McGowan
|
|
|
02/12- L1 SFD ePlan
|
Routing - PLANNING | 1/24/2020 | | 1/24/2020 | | FAIL |
Katelyn Menuge
|
|
|
Need recorded common wall agreement, changes to site plan.
|
Intake Approval | | | 1/24/2020 | | FAIL |
|
|
|
2nd Prescreen:
1. Please provide a building cross section from footing to top of roof. Please reference wall components. Specify sheathing, siding material, interior wall covering and vapor barrier. More than one cross section may be required. 1-24-20
|
Intake Approval | | | 1/24/2020 | | PASS |
|
|
|
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 12:48PM
|
Intake Approval | | | 1/23/2020 | | FAIL |
|
|
|
1st Prescreen:
1. Documents in drawings tab and documents tab are the same. There are no architectural drawings. Please upload architectural drawings (site plan, floor plan) in the drawings folder. Prescreen not completed because no drawings were uploaded.
|