BLD-Energy code compliance | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Tell Riley
|
|
|
pass with Res check provided by designer//add Vb at garage separation wall as discussed//
|
BLD-Framing/Rough-in | 6/21/2020 | 6/22/2020 | 6/22/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//framing corrections made//
|
BLD-Energy code compliance | 6/17/2020 | 6/19/2020 | 6/19/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//u-values and R values do not meet minimum code//provide res-check to meet code minimums as discussed on frame walk through//repair joist per engineering//add VB to garage separation wall//other framing corrections completed//if walls are covered, at own risk and energy code requirements will need to be met//
|
BLD-Framing/Rough-in | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//see CN posted for minor framing corrections//ok to insualate only//
|
BLD-Framing/Rough-in | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Andy Thompson Inspection cancelled from web by: Andy Thompson
|
BLD-Framing/Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//need mechanical, did walk through for corrections//will need re-insepction//
|
BLD-Wall cover | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//wall bracing inspection//nails added in areas while onsite//add blocking on shear panels between trusses and nail//add hold down on corner-see plans//add straps on inside of PFH//exterior ok to wrap//
|
BLD-Wall Bracing | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//need approved plans onsite//will re-schedule//
|
BLD-Concrete | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//concrete was already poured//could see edges of VB//
|
BLD-Energy code compliance | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//foundation insulation for slab on grade--ok per plans//
|
BLD-Foundation | 4/24/2020 | 4/27/2020 | 4/27/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//bar in correct locations//setbacks were measure due to footings being poured prior to inspection, they appear to be ok//wall ok, contractor assumes all liablity on footings as they were poured prior to inspection//
|
BLD-Footing | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | DEFR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//footings were poured prior to inspection//Contractor assumes all liability for footings//
|
OVERRIDE | | | 4/24/2020 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2020 | | DONE |
|
|
|
Need RP
|
Routing - Addressing | 4/22/2020 | | 4/23/2020 | | PASS |
Doug Chausow
|
|
|
Primary address: 9405 W Ustick Rd
2nd address: 9403 W Ustick Rd
|
Routing - PUBLIC WORKS | 4/22/2020 | | 4/23/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR SFD CONVERTING TO DUPLEX 9403 & 9405
|
Route to Impact Fee Review | 4/22/2020 | 4/27/2020 | 4/22/2020 | | PASS |
Travis P Black
|
|
|
|
Plan assigned to (JAB) Josh | 4/8/2020 | 4/8/2020 | 4/22/2020 | | PASS |
Josh Bogle
|
|
|
04/13 duplex, ePlan - 1st done
|
Plan Reviewer's activity | | | 4/22/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLANNING | 4/22/2020 | | 4/22/2020 | | PASS |
Nicolette Womack
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Telephone call | | | 4/22/2020 | | DONE |
|
|
|
waiting to hear back from C about needing to be review by addressing and PW or not.
|
CHANGE STATUS TO (REV) | | | 4/22/2020 | | DONE |
|
|
|
didn't get routed to pw, address, prk and need ach fee amount
|
Routing - PLANNING | 4/20/2020 | | 4/20/2020 | | FAIL |
Nicolette Womack
|
|
|
Include notes on site plan:
• The existing curb cut along Ustick Rd. shall be removed and replaced with curb, gutter and sidewalk approved by ACHD.
• Irrigation details were not included with the site plan and will be required within the building permit for review. All landscaping shall be maintained in a healthy and attractive condition and shall be irrigated by an appropriate underground irrigation system.
Submit a copy of the recorded cross access agreement for the 20’ wide shared driveway, which was also a condition of approval
|
Routing - PLAN CHECK | 4/17/2020 | | 4/17/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/8/2020 | | 4/15/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan and e-mail to Andy
|
1st review completed | | | 4/15/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 4/13/2020 | | 4/14/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/13/2020 | | 4/13/2020 | | FAIL |
Nicolette Womack
|
|
|
Driveway and parking shall match as approved by CAA20-00032. Shared driveway needs to be 20' wide.
|
Routing - PLANNING | 4/8/2020 | | 4/8/2020 | | DONE |
Sue Cummings
|
|
|
sent this to Nicolette
|
Intake Approval | | | 4/8/2020 | | FAIL |
|
|
|
1. Please provide the information or state on which plan the ResCheck information is on.
2. We are using the 2015 IRC code year. Please update all 2012 IRC code information to 2015.
|
Intake Approval | | | 4/8/2020 | | PASS |
|
|
|
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 2:17PM
|