BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PASS |
Jim Storey
|
|
|
Screened- Shanel Phone #: ###-####
|
DOC - Permit Finaled | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval Temp | 8/3/2020 | 8/3/2020 | 8/3/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary BND20-00124
|
BLD-Framing/Rough-in | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Jim Storey
|
|
|
Fenale Phone #: ###-####
|
BLD-Energy code compliance | 5/21/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Jim Storey
|
|
|
screened // Sanel Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PART |
Brandon Shaw
|
|
|
Per verble, Provive truss Engineering approval for truss modifaction to E02 and F01 trusses, front entryway/hallway... OK to insulate...
|
Routing - MECHANICAL | 5/19/2020 | | 5/19/2020 | | PASS |
Chad Schwendiman
|
|
|
Revised acca report
|
BLD-Wall Bracing | 5/5/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Jim Storey
|
|
|
Sanle Phone #: ###-#### screened
|
BLD-Energy code compliance | 5/4/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Jim Storey
|
|
|
*screened* Sanel Phone #: ###-####
|
BLD-Wall Bracing | 4/15/2020 | 4/17/2020 | 4/17/2020 | A | PASS |
Jim Storey
|
|
|
screened - house, check gypsum in garage // Dannell Phone #: ###-#### exterior ok
|
BLD-Wall Bracing | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PART |
Tell Riley
|
|
|
*Screened* - Sanel, detached garage Phone #: ###-####//ok per plans//exterior walls only//garage only//
|
BLD-Foundation | 3/22/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Louie
|
BLD-Footing | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Jim Storey
|
|
|
Nick Phone #: ###-####
|
BLD-Footing | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PART |
Jim Storey
|
|
|
Sanel Phone #: ###-####
|
BLD-Footing | 3/16/2020 | 3/18/2020 | 3/18/2020 | A | CANC |
Jim Storey
|
|
|
Sanel Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 2/3/2020 | 2/3/2020 | 3/5/2020 | | DONE |
Rob Patrick
|
|
|
3rd Review Complete: 02/14 sfd L1 ePlan...02/13 Failed...03/04 Failed
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 3/5/2020 | | 3/5/2020 | | FAIL |
Katelyn Menuge
|
|
|
Need most recent elevations uploaded over elevation sheet- use same name
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 3/5/2020 | | 3/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 3/5/2020 | | 3/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/5/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/4/2020 | | 3/4/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
Routing - Design Review | 3/4/2020 | | 3/4/2020 | | FAIL |
Katelyn Menuge
|
|
|
No changes needed for DR- Rob can delete duplicate drawings.
|
Routing - Design Review | 2/27/2020 | | 2/27/2020 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks. Applicant needs to version drawings.
|
Plan Reviewer's activity | | | 2/24/2020 | | |
|
|
|
Emailed applicant to email a new Cover sht with the same name so it will version.
|
Routing - Design Review | 2/24/2020 | | 2/24/2020 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks. Applicant needs to version drawings.
|
Routing - PLAN CHECK | 2/24/2020 | | 2/24/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
1st review completed | | | 2/13/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 2/3/2020 | | 2/13/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 2/3/2020 | 2/6/2020 | 2/4/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 2/3/2020 | | 2/4/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/3/2020 | | 2/3/2020 | | FAIL |
Katelyn Menuge
|
|
|
Upload a recorded common wall agreement, letter from Idaho Power stating clearances are met, update drawings to meet changemarks.
|
Routing - PUBLIC WORKS | 2/3/2020 | | 2/3/2020 | | PASS |
Morgan Webb
|
|
|
CREDIT FOR DEMO***PLUG PERMIT STILL NEEDS FINALEZED***PLEASE DO NOT ISSUE WITHOUT PLUG FINALED
|
Routing - Addressing | 2/3/2020 | | 2/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 2/3/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/31/2020 | | FAIL |
|
|
|
1. Please change names on document to reflect what is on the individual sheets. Ex. A 0.0_CoverSheet, S1.0_BuildingSections, A1.0 Foundation
2. Change header name from "Plan 3" to relevant parcel address and add address to all drawing sheets.
|
Intake Approval | | | 1/30/2020 | | FAIL |
|
|
|
Drawings must be uploaded individually in the Drawings folder. Full prescreen not complete
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 9:35PM
|