BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PASS |
Jim Storey
|
|
|
Screened- Shanel Phone #: ###-####
|
DOC - Permit Finaled | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval Temp | 8/3/2020 | 8/3/2020 | 8/3/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary BND20-00124
|
BLD-Energy code compliance | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Jim Storey
|
|
|
Channel *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Jim Storey
|
|
|
Channel *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PART |
Dave Hannah
|
|
|
Chanel *screened* Phone #: ###-#### ok to insulate but need to fix floor joist that PLUMBER uver cut and cut bottom cord need to add studs under north end 3ply truss second fl.
|
BLD-Wall Bracing | 5/4/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Jim Storey
|
|
|
*screened* Sanel Phone #: ###-####
|
BLD-Wall Bracing | 5/1/2020 | 5/4/2020 | 5/4/2020 | P | NR |
Jim Storey
|
|
|
screened // Sanel Phone #: ###-####
|
BLD-Wall Bracing | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PART |
Tell Riley
|
|
|
*Screened* - Sanel, detached garage Phone #: ###-####//ok per plans//exterior walls only//garage only//
|
BLD-Foundation | 3/22/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Louie
|
BLD-Footing | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Jim Storey
|
|
|
Nick Phone #: ###-####
|
BLD-Concrete | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PART |
Jim Storey
|
|
|
Sanel Phone #: ###-####
|
BLD-Footing | 3/16/2020 | 3/18/2020 | 3/18/2020 | A | CANC |
Jim Storey
|
|
|
Sanel Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/6/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 3/6/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 2/3/2020 | 2/3/2020 | 3/5/2020 | | DONE |
Rob Patrick
|
|
|
3rd Review Complete: 02/14 sfd L1 ePlan...02/14....03/04 Failed
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLANNING | 3/5/2020 | | 3/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 3/5/2020 | | 3/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | PASS |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 3/5/2020 | | 3/5/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2020 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 3/4/2020 | | 3/4/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
Routing - Design Review | 3/4/2020 | | 3/4/2020 | | FAIL |
Katelyn Menuge
|
|
|
No changes needed for DR- Rob can delete duplicate drawings.
|
Routing - Design Review | 2/27/2020 | | 2/27/2020 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks. Applicant needs to version drawings.
|
Plan Reviewer's activity | | | 2/24/2020 | | |
|
|
|
Emailed applicant to email a Cover sht with the same name so it will version.
|
Routing - Design Review | 2/24/2020 | | 2/24/2020 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks. Applicant needs to version drawings.
|
Routing - PLAN CHECK | 2/24/2020 | | 2/24/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
1st review completed | | | 2/14/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning comments. Blding Review is good.
|
Routing - PLAN CHECK | 2/3/2020 | | 2/14/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning comments. Blding Review is good.
|
Route to Impact Fee Review | 2/3/2020 | 2/6/2020 | 2/4/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 2/3/2020 | | 2/4/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/3/2020 | | 2/3/2020 | | FAIL |
Katelyn Menuge
|
|
|
Upload a recorded common wall agreement, letter from Idaho Power stating clearances are met, update drawings to meet changemarks.
|
Routing - Addressing | 2/3/2020 | | 2/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/3/2020 | | 2/3/2020 | | PASS |
Morgan Webb
|
|
|
|
Telephone call | | | 2/3/2020 | | DONE |
|
|
|
Got clarification on which parcel was being reviewed on plans. Highlighted the individual parcel on eplan.
|
Plans ACCEPTED BY PLAN TECH | | | 2/3/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/3/2020 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2020 | | DONE |
|
|
|
deleted the file in drawing folder in Eplan because everything was in one file and applicant request for clarity, (per Tisha this is okay because is just prescreen)
|
Intake Approval | | | 1/30/2020 | | FAIL |
|
|
|
Plans must be uploaded as individual sheets.
Please indicate which parcel this is by high-lighting it on your plan.
Drawing file names must include the first characters of the discipline name, followed by the sheet number and name. Example: A2.0_Floor Plan
Please adjust your plans to allow for stamp area.
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2020 9:52PM
|