BLD-Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mike Jordan
|
|
|
Call for Access Phone #: ###-#### Inspection requested via web by Allen Jones
|
DOC - Permit Finaled | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/9/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Mike Jordan
|
|
|
Covered Patio Phone #: ###-#### Inspection requested via web by Allen Jones
|
BLD-Framing/Rough-in | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | FAIL |
Mike Jordan
|
|
|
Back Covered Patio inspection
Plans in house on counter Phone #: ###-#### Inspection requested via web by Allen Jones. Patio not built per plans and engineering.
|
BLD-Energy code compliance | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Brandon Shaw
|
|
|
Alan Phone #: ###-####
|
BLD-Footing | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Mike Jordan
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Framing/Rough-in | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | FAIL |
Mike Jordan
|
|
|
screened // Alan Phone #: ###-####. Provide truss engineering. roll block floor joist at glue lam beams in kitchen. Fire block at B vent, 2nd floor ceiling. Ok to insulate.
|
CHANGE STATUS TO (ISS) | | | 4/2/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/24/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 3/19/2020 | 3/19/2020 | 3/24/2020 | | DONE |
Debbie Sanine
|
|
|
3/25/20 sfd L1 ePlan - patio engineering plan mod - Bldg review passes. Pending Planning review
|
Routing - PLANNING | 3/19/2020 | | 3/24/2020 | | PASS |
Crystal Rain
|
|
|
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
BLD-Wall Bracing | 3/18/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Mike Jordan
|
|
|
shear // Ben Phone #: ###-####
|
Plan Reviewer's activity | | | 3/20/2020 | | DONE |
Debbie Sanine
|
|
|
No residential plan mod review fee
|
Routing - PLAN CHECK | 3/19/2020 | | 3/19/2020 | | PASS |
Debbie Sanine
|
|
|
|
Plan Modification Accepted | | | 3/19/2020 | | DONE |
|
|
|
Allen Jones from Hayden Homes emailed requesting a plan mod for patio engineering.
|
BLD-Foundation | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by 2084207023
|
BLD-Foundation | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | NR |
Mike Jordan
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 2/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2020 | | DONE |
|
|
|
sent email, rbeaman@hayden-homes.com, informing not all fees were paid
|
OVERRIDE | | | 2/13/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 2/4/2020 | 2/4/2020 | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
|
Plan Reviewer's activity | | | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
Covered patio to come in as a plan mod and will not be built until engineering calculations are submitted, in a couple of weeks.
|
Routing - PLAN CHECK | 2/13/2020 | | 2/13/2020 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/13/2020 | | DONE |
|
|
|
met
|
Plan Reviewer's activity | | | 2/12/2020 | | DONE |
|
|
|
Hayden resubmitted without attaching signed & stamped eng. calculations. Requested they email to me, and I can upload into ePlan.
|
1st review completed | | | 2/10/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/28/2020 | | 2/10/2020 | | FAIL |
Jenny Nelson
|
|
|
Per D_S review
|
Plan assigned to (J_N) | 1/28/2020 | 1/28/2020 | 2/4/2020 | | DEFR |
Jenny Nelson
|
|
|
02/10 sfd L1 ePlan
|
Routing - PLANNING | 1/28/2020 | | 1/30/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - Addressing | 1/28/2020 | | 1/30/2020 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 1/28/2020 | 1/31/2020 | 1/29/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 1/28/2020 | | 1/29/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 1/28/2020 | | 1/29/2020 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2020 | | DONE |
|
|
|
|
Intake Approval | | | 1/28/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/28/2020 | | DONE |
|
|
|
|
Application received | | | 1/26/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 26 2020 7:48AM
|
Routing - PLAN CHECK | 3/19/2020 | | | | |
Debbie Sanine
|
|
|
|