FIRE-Final Inspection | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.
- call for access Larry Phone #: ###-####
|
BLD-Final | 5/29/2020 | 6/1/2020 | 6/1/2020 | A | PASS |
Dave Hannah
|
|
|
call ahead 30 minutes - screened - late am // Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Dave Hannah
|
|
|
call 30 minutes ahead for access // Larry Phone #: ###-####
|
Print Occupancy Form | | | 2/25/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 2/10/2020 | 2/10/2020 | 2/19/2020 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 02/18 L2 Canine Design Pet Salon ePlan
|
Routing - PLAN CHECK | 2/19/2020 | | 2/19/2020 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/19/2020 | | DONE |
|
|
|
ALL MET (ilevenson@hbarchitecture.com)
Need
GC Form
Revised Cert of Value
|
Route to Impact Fee Review | 2/14/2020 | 2/17/2020 | 2/18/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/14/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 2/10/2020 | | 2/14/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 2/10/2020 | | 2/14/2020 | | PASS |
Kevin Holmes
|
|
|
Signed off in ePlan by Planning Kevin Holmes
|
Routing - MECHANICAL | 2/10/2020 | | 2/13/2020 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 2/10/2020 | | 2/12/2020 | | PASS |
Doug Chausow
|
|
|
Changed Suite # to 110 (from 1B)
|
Routing - PUBLIC WORKS | 2/10/2020 | | 2/12/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO
|
Telephone call | | | 2/11/2020 | | DONE |
|
|
|
as per Adam Garcia-this was not a hair salom but a very small spa-restroom area is the area for all the suites to share and is not part of the building permit- i put an email in the docs from him about the fixtures that were removed
|
Routing - PLUMBING | 2/10/2020 | | 2/11/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 2/5/2020 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 1/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2020 10:50AM
|