Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-00295
StatusIssued
Name RADIX CONSTRUCTION INC
Site Address 11211 W FAIRVIEW AVE
Project NameStarbucks Building Shell
Customer Number 
ePlanReviewYes
Description
(STARBUCKS - BUILDING SHELL) (CUP19-00075) (DRH19-00501) This building does not have a fire sprinkler system. Permit to construct new 2,200 sq ft restaurant shell building with drive through. This shell permit is not intended to establish a Certificate of Occupancy for any portion of the building. Approval is contingent upon adhering to the approved plans on file. Work is to include: concrete footings and stem wall, wood stud walls, wood shear walls with hold downs, steel columns, wood headers, engineered wood roof trusses, wood roof sheathing, exterior windows, exterior doors, exterior wall finishes, roof insulation installed on top of the roof deck, and a roof covering. Masonry trash enclosure with steel gates and drive through cover will also be constructed. Special inspections required for soils, concrete, masonry and steel welding. **JJN**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing6/30/20207/1/20207/1/2020APASS
DetailsMike Jordan
Could not answer questions......shear // rod Phone #: ###-####. Interior shear wall ok.
BLD-Wall Bracing6/30/20206/30/20206/30/2020PNR
DetailsMike Jordan
Rod *screened* Phone #: ###-####
BLD-Energy code compliance6/23/20206/23/20206/23/2020PPASS
DetailsMike Jordan
Screened- Rod Phone #: ###-####
BLD-Framing/Rough-in6/18/20206/18/20206/18/2020PPASS
DetailsMike Jordan
screened // rod Phone #: ###-####
BLD-Framing/Rough-in6/8/20206/9/20206/9/2020PCANC
DetailsMike Jordan
screen walls on roof for mechanical - Rod Phone #: ###-####
BLD-Wall Bracing6/5/20206/5/20206/5/2020PPASS
DetailsMike Jordan
Rod *screened* Phone #: ###-####. Exterior walls and roof ok.
BLD-Framing/Rough-in6/1/20206/2/20206/2/2020ACANC
DetailsMike Jordan
roof nailing - Rod *screened* Phone #: ###-####. Will reschedule.
BLD-Concrete5/15/20205/18/20205/18/2020APASS
DetailsMike Jordan
slab and vabor Rob Phone #: ###-####
BLD-Foundation5/12/20205/13/20205/13/2020PPASS
DetailsMike Jordan
Screened-foundation insulation inspection- Rod Phone #: ###-####
BLD-Foundation5/5/20205/7/20205/7/2020PPASS
DetailsMike Jordan
Rod Phone #: ###-####. column pedestals for drive thru.
BLD-Footing4/30/20205/1/20205/1/2020PPART
DetailsMike Jordan
screened // Rod Phone #: ###-####. Column pad footings for trellis . Ok to place concrete pending special inspection.
BLD-Energy code compliance4/20/20204/21/20204/21/2020APASS
DetailsMike Jordan
screened // rod Phone #: ###-####. rigid insulation on stemwall.
BLD-Foundation4/15/20204/17/20204/17/2020APART
DetailsMike Jordan
Rod Phone #: ###-####. Perimeter stemwall. Noted column ties at brace frame not per plan. Special inspector to make note of repair prior to concrete placement.
BLD-Footing4/10/20204/13/20204/13/2020PPASS
DetailsMike Jordan
Rod Phone #: ###-####. Perimeter footings ok.
Issue PAID IN FULL permit  4/6/2020 DONE
Inspection Record Card- Bld  4/6/2020 DONE
Telephone call  4/6/2020 DONE
email permits and inspection card- Eplan needs to be release
OVERRIDE  4/3/2020  
Plan assigned to (J_N)2/7/20202/11/20204/3/2020 DONE
DetailsJenny Nelson
1st complete 03/19 - 502 Fairview Starbucks Bldg Shell
Routing - PLAN CHECK4/3/2020 4/3/2020 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  4/3/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  4/3/2020 DONE
MET Jesse Roberto
REVISED CERT
GC
ACHD
Routing - PLAN CHECK3/25/2020 4/2/2020 FAIL
DetailsJenny Nelson
Routing PW Drainage3/27/2020 4/1/2020 PASS
DetailsJason C. Taylor
Routing - FIRE3/25/20203/25/20203/31/2020 PASS
DetailsErika Akin
Attached comments to case
Plan Reviewer's activity  3/26/2020 DONE
DetailsJenny Nelson
Architect asked for task in ePlan to be sent back for updated sheets to be uploaded again.
Route to Impact Fee Review3/24/20203/27/20203/25/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing PW Drainage3/24/2020 3/25/2020 FAIL
DetailsJason C. Taylor
See changemarks in ePlan. JCT
Routing - Design Review3/19/2020 3/19/2020 PASS
DetailsKatelyn Menuge
Routing - FIRE2/11/20202/11/20203/10/2020 FAIL
Sent back to applicant in eplan for changes at their request. No review done.
Routing Off Site - STRUCTURAL2/11/2020 3/10/2020 PASS
Details
AHJ
Routing - PLAN CHECK2/11/2020 3/10/2020 FAIL
DetailsJenny Nelson
Architect requested task in ePlan be sent back so can upload plans that have been updated since initial submittal.
1st review completed  3/10/2020 DONE
DetailsJenny Nelson
Architect request task sent back to upload plans that had been updated since initial submittal.
Plan Reviewer's activity  3/10/2020 DONE
DetailsJenny Nelson
Plan review and fire sent back before 1st review per architects request due to additional information being added to drawings.
Plan resubmittals received  3/5/2020 DONE
applicant submitted Appendix J. I gave it to Brian Murphy.
Routing PW Drainage2/12/2020 2/27/2020 FAIL
DetailsBrian Murphy
NEED APPENDX J
Routing PW Solid Waste2/12/2020 2/25/2020 PASS
DetailsEvan Carpenter
Approved with addition of gates on the solid waste enclosure
Routing PW Environmental2/12/2020 2/18/2020 PASS
DetailsRick Christenson
Approved with grease interceptor as shown.
Routing - Addressing2/11/2020 2/13/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/11/2020 2/13/2020 PASS
DetailsCandy A. Nichols
NO ASSESSMENT DUE FUTURE BUILD OUT WILL HAVE FEES
Routing PW Street Lights2/12/2020 2/13/2020 PASS
DetailsTom Marshall
Routing - MECHANICAL2/11/2020 2/13/2020 PASS
DetailsChad Schwendiman
Routing - PLUMBING2/11/2020 2/13/2020 PASS
DetailsDaryl Spivey
See redline notes on P4.0
Routing - Design Review2/11/2020 2/13/2020 FAIL
DetailsKatelyn Menuge
Design Review Corrections Required, see changemarks
Routing PW Sewer Design2/12/2020 2/12/2020 PASS
DetailsDeAnn Brown
Building connecting to existing sewer service stub.
Routing - Erosion and Sediment2/11/2020 2/11/2020 PASS
DetailsMichael Zawacki
RP needed. Site prep required.
Routing - PLANNING2/11/2020 2/11/2020 PASS
DetailsNicolette Womack
Intake Approval  2/7/2020 PASS
DetailsCarl D Madsen
Application received  1/28/2020 DONE
Application submitted via PDS Online on Jan 28 2020 3:03PM