Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-00301
StatusFinaled
Name VERTICAL CORP
Site Address 1501 S FEDERAL WAY Unit: 100
Project NameYour Health Id-View Point Bld
Customer Number 
ePlanReviewYes
Description
(YOUR HEALTH IDAHO - VIEW POINT BUILDING) This building is not fire sprinklered. A (4) hour fire wall separates the two buildings. Permit to remodel a 10,536 sq. ft. tenant space that was previously occupied by Advantest America under BLD00-03386. Work is to include: Removal of select non-structural walls, removal of existing raised floor in current Training Room, construction of new select interior nonbearing walls to create new Offices and Conference Rooms, add required structure for a folding panel partition (See Engineering) and interior finishes in compliance with Ch. 8 of the 2015 IBC. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20208/4/2020 DONE
This permit finaled on the web by Todd Weltner
First Notice 6/27/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  6/17/2020 DONE
BLD-Final6/16/20206/16/20206/16/2020PPASS
DetailsJim Storey
Kent *screened* Phone #: ###-#### final per the reviewed plan.
FIRE-Final Inspection6/15/20206/16/20206/16/2020APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work is complete, signature provided on permit sign off card.

Screened-Kent Phone #: ###-####
BLD-Framing/Rough-in5/19/20205/20/20205/20/2020APASS
DetailsJim Storey
screened // kent Phone #: ###-#### si report/ engineer aproved beam c/n ok
BLD-Framing/Rough-in4/29/20204/29/20204/29/2020PFAIL
DetailsJim Storey
call for access // Kent Phone #: ###-#### c/n s11// #8 and #10 not per design// engineer to field review and sub mit as built.
BLD-Framing/Rough-in4/7/20204/8/20204/8/2020APASS
DetailsDave Hannah
*screened* - Kent Phone #: ###-####
BLD-Framing/Rough-in4/6/20204/7/20204/7/2020ANH
DetailsDave Hannah
Ken ***cleared*** Phone #: ###-####8 no one on site door is locked and no reply on phone
Issue PAID IN FULL permit  3/30/2020 DONE
Print Occupancy Form  3/30/2020 DONE
Plan assigned to (BJM)2/5/20202/5/20203/26/2020 DONE
DetailsBrian McGowan
03/17- 1st Review Complete- Your Health Idaho L-3
PLANS/APPL TAKEN TO FRONT DESK  3/26/2020 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/26/2020 DONE
all met: todd@vertical-corp.com

NEED
GC
REV VALUE
Routing - PLAN CHECK3/10/2020 3/26/2020 PASS
DetailsBrian McGowan
Routing Off Site - STRUCTURAL3/10/2020 3/17/2020 PASS
DetailsBrian McGowan
Route to Impact Fee Review3/6/20203/9/20203/9/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  3/6/2020 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK2/5/2020 3/6/2020 FAIL
DetailsBrian McGowan
Routing - FIRE2/5/20202/5/20203/5/2020 PASS
DetailsGreg Ruxton
Attached comments to case.
Routing Off Site - STRUCTURAL2/5/2020 3/4/2020 FAIL
DetailsBrian McGowan
AHJ
Routing - PLANNING2/5/2020 2/11/2020 PASS
DetailsEthan Mansfield
Routing - MECHANICAL2/5/2020 2/10/2020 PASS
DetailsChad Schwendiman
Routing - Addressing2/5/2020 2/7/2020 PASS
DetailsDoug Chausow
Intake Approval  1/30/2020 FAIL
DetailsJulie Romig
Need: 1. Form 310 completed with Design Professional information, Owner information, and Owner signature.
Intake Approval  1/30/2020 PASS
Application received  1/29/2020 DONE
Application submitted via PDS Online on Jan 29 2020 10:50AM