BLD-Wall Bracing | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PART |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/29/2020 | 4/29/2020 | 4/29/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 4/28/2020 | 4/28/2020 | 4/28/2020 | | DONE |
Melissa Jannusch
|
|
|
*Garage and North Half of House (crawlspace level)* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PASS |
Brandon Shaw
|
|
|
Basement walls... Work in progress...
|
BLD-Footing | 4/5/2020 | 4/6/2020 | 4/6/2020 | A | PART |
Brandon Shaw
|
|
|
Basement footings... Work in progress...
|
PubWorks Subgrade Approval | 4/3/2020 | 4/3/2020 | 4/3/2020 | | DONE |
Melissa Jannusch
|
|
|
Basement and ground level.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Override - Parcel Holds | | | 3/19/2020 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/18/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 3/3/2020 | 3/3/2020 | 3/18/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2020 | | DONE |
Debbie Sanine
|
|
|
|
Override - Parcel Holds | | | 3/18/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 3/18/2020 | | DONE |
|
|
|
MET
|
Routing - PLANNING | 3/3/2020 | | 3/17/2020 | | PASS |
Ethan Mansfield
|
|
|
3/17/20 - CURRENT PLANNING REVIEW PASSES PER ETHAN
|
Routing PW Grading-Hillside | 3/4/2020 | | 3/17/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 3/6/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 3/3/2020 | | 3/6/2020 | | PASS |
Debbie Sanine
|
|
|
|
Routing - FIRE | 3/3/2020 | 3/3/2020 | 3/5/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required. All measurements are within required tolerances. No review comments provided.
|
Route to Impact Fee Review | 3/3/2020 | 3/6/2020 | 3/4/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 3/3/2020 | | 3/4/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 3/3/2020 | | 3/4/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/3/2020 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/3/2020 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/3/2020 | | PASS |
|
|
|
Spoke with Ethan who was the planner for the CFH case, ok to taken in building permit
|
Routing - Erosion and Sediment | 3/3/2020 | | 3/3/2020 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
Routing - Addressing | 3/3/2020 | | 3/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 3/3/2020 | | 3/3/2020 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 2/11/2020 | | FAIL |
|
|
|
2nd Prescreen: Your must wait for your case with Planning and Zoning -CFH20-00008 to be approve and appeal period to be over before applying for this building permit. If you have any questions you may contact Planning and Zoning at ###-####
|
Intake Approval | | | 1/30/2020 | | FAIL |
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
1st Prescreen:
1. Per Melissa Jannusch, P&Z Application #114 will need to be filled out prior to building permit issuance. Please contact ###-#### for assistance.
|
Application received | | | 1/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2020 1:26PM
|