BLD-Energy code compliance | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Brandon Shaw
|
|
|
Angela Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Footing | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Brandon Shaw
|
|
|
Hazen Phone #: ###-####
|
Routing Walk-In (BLD) | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Josh Bogle
|
|
|
applicant not applying for a plan modification at this time
|
Plan assigned to (JAB) Josh | 2/14/2020 | 2/14/2020 | 2/21/2020 | | FAIL |
Josh Bogle
|
|
|
Plan Mod for Structural Calculations - no floor plans for context
|
CHANGE STATUS TO (ISS) | | | 2/21/2020 | | DONE |
|
|
|
Not doing the plan mod - per Josh
|
Plan Modification Accepted | | | 2/14/2020 | | DONE |
|
|
|
Plan Mod for Structural Calculations
|
Routing Walk-In (BLD) | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/31/2020 | | 1/31/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/31/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/31/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/31/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 1/31/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 1/31/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/31/2020 | | DONE |
|
|
|
|
Application received | | 1/31/2020 | | | |
|
|
|
|