BLD-Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Dave Hannah
|
|
|
chris Phone #: ###-####
|
DOC - Permit Finaled | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Dave Hannah
|
|
|
|
Routing Walk-In (BLD) | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 3/4/2020 | 3/4/2020 | 3/6/2020 | | PASS |
Josh Bogle
|
|
|
03/10 modification, paper - 1st done
|
Routing - PLAN CHECK | 3/6/2020 | | 3/6/2020 | | PASS |
Josh Bogle
|
|
|
no fee per reduction in project size
|
Case Summary (BLD) | | | 3/6/2020 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/6/2020 | | DONE |
|
|
|
no plan mod fee per Josh
|
CHANGE STATUS TO (ISS) | | | 3/6/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/4/2020 | | 3/5/2020 | | FAIL |
Josh Bogle
|
|
|
plans unclear
|
BLD-Framing/Rough-in | 3/3/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
Plan Modification Accepted | | | 3/4/2020 | | DONE |
|
|
|
Chris submitting a plan modification to the garage. Reducing total sq. ft from 700sqft to 400 sq ft.
|
BLD-Footing | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
Routing Walk-In (Zoning) | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Crystal Rain
|
|
|
|
Routing Walk-In (BLD) | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/3/2020 | | 2/3/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/3/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/3/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 2/3/2020 | | DONE |
|
|
|
|
Application received | | 2/3/2020 | | | |
|
|
|
|