BLD-Final | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Brandon Shaw
|
|
|
Guy - Requesting Virtual Inspection Phone #: ###-####
|
DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PEND |
Dave Hannah
|
|
|
ok to insulate but need engineering on truss that has the ends of the roof and ceiling rafters nailed to it its not engineer as a gridder truss
|
BLD-Wall Bracing | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PASS |
Dave Hannah
|
|
|
Energy seal is now complete and the rough-in ready to go Phone #: ###-#### Inspection requested via web by Guy Falconer
|
BLD-Framing/Rough-in | 3/23/2020 | 3/23/2020 | 3/23/2020 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Guy Falconer needs to inslall air seal and block and nail shear wall pannels
|
BLD-Foundation | 2/11/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Guy Falconer
|
Routing - MECHANICAL | 2/7/2020 | | 2/7/2020 | | PASS |
Troy James
|
|
|
Manual j report submitted
|
Routing Walk-In (BLD) | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/5/2020 | | 2/5/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/5/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/5/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 2/5/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/5/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 2/5/2020 | | 2/5/2020 | | PASS |
Sue Cummings
|
|
|
|
Application received | | 2/5/2020 | | | |
|
|
|
|