Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD20-00366
StatusIssued
Name BENITON CONSTRUCTION
Site Address 1607 N 15TH ST
Project NameWASHINGTON ELEMENTARY ADDITION
Customer Number 
ePlanReviewYes
Description
(WASHINGTON ELEMENTARY)(Project Mangement-Ron Hill) "PLAN MODIFICATION FOR MINOR ALTERATIONS TO THE DRAINAGE SYSTEM GREASE INTERCEPTOR, SIGNAGE AND ELEVATOR DETAILS"" EXPEDITED REVIEW* Construction of a 14,020 sq. ft. addition to the existing 28,476 sq. ft. Washington Elementary school to include administrative offices, a library, gymnasium, and three classrooms to replace the existing portables.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/12/20208/13/20208/13/2020PPEND
DetailsTony Young
Grout/Rebar/Masonry inspection request along B grid line. Grouting 35 to 38 feet at 2pm. Dividing wall in the gym between mechanical room 4'' to 8''. MTI scheduled as well. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Foundation8/7/20208/7/20208/10/2020PPEND
DetailsTony Young
24-27 foot masonry/rebar grout inspection request. Placing at 2pm today. MTI is scheduled as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Foundation8/4/20208/4/20208/4/2020PPART
DetailsTony Young
20-24 foot lift of Masonry for the gym addition. Rebar/Masonry inspection request. MTI will be on site as well. Grout is at 2pm. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// masonary pending special inspection.. ?s on shafts.. need to maintain fire wall ratings
BLD-Foundation8/3/20208/3/20208/3/2020PPEND
DetailsTony Young
Masonry/Rebar inspection request for 16 to 20 foot masonry at the new gym. MTI is scheduled to be on site as well. Call Dan with any issues. Grout is at 2pm. Phone #: ###-#### Inspection requested via web by Dan Koski// pending S.I
BLD-Foundation7/30/20207/30/20207/30/2020PPEND
DetailsDave Hannah
Masonry/Rebar inpsection request for new gym. Remaining 12 to 16 feet of masonry being grouted at 2pm. MTI scheduled to be on site as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski ok grout after spec inspection aproves
BLD-Foundation7/29/20207/29/20207/29/2020PPART
DetailsJim Storey
Masonry/Rebar inspection request for the new gym addition. Grouting at 2pm from 12 to 16 feet. MTI will be on site as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski/// ok pending special inspection report
BLD-Foundation7/27/20207/28/20207/28/2020PPART
DetailsTony Young
Grout/Rebar inspection request for Masonry. New gym addition 8 to 12 foot section scheduled for 1pm. Call Dan with any issues. MTI on site as well. Phone #: ###-#### Inspection requested via web by Dan Koski// ok pending special inspection report
BLD-Foundation7/23/20207/23/20207/23/2020PPEND
DetailsTony Young
Rebar/Masonry Inspection request. Grout is at 2pm. MTI is scheduled as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski/// pending special inspection
BLD-Foundation7/21/20207/22/20207/22/2020PPART
DetailsTony Young
Rebar/Masonry inspection request. I didn''t know if Tony was going to want to look at rebar for the structural block in the gym. Grout is scheduled for 3pm. Please call Dan if there are any issues. MTI is on the books as well. Phone #: ###-#### Inspection requested via web by Dan Koski/// work in progress,, pending special inspection
BLD-Concrete7/17/20207/17/20207/17/2020PPART
DetailsBrandon Shaw
VB and Rebar inspection request for the new addition gym slab. Scheduled to place Monday. Special inspection will perform rebar and concrete as well.
special inspection personal on site,, pending approvals...
BLD-Foundation6/23/20206/24/20206/24/2020APASS
DetailsBrandon Shaw
Stem wall placement for the gym. Grids A-B, 1-7. Rebar inspection...
Pending special inspection...
BLD-Footing6/17/20206/18/20206/18/2020APART
DetailsTony Young
Footing rebar inspection request for the Gymnasium Addition. Grids 1-7 and Grids A-B. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// special inspection personal on site,, pending approvals
OVERRIDE  6/15/2020  
Plan assigned to (CDM)5/29/20205/29/20206/15/2020 PASS
DetailsCarl D Madsen
plan mod
Routing - PLAN CHECK6/5/2020 6/15/2020 PASS
DetailsCarl D Madsen
Permit Ready to Issue  6/15/2020 DONE
PLAN MOD MET
CHANGE STATUS TO (ISS)  6/15/2020 DONE
plan mod
Routing - PUBLIC WORKS6/5/2020 6/5/2020 PASS
DetailsMorgan Webb
Routing PW Drainage6/5/2020 6/5/2020 PASS
DetailsBrian Murphy
new pipe elevation into bed
Routing PW Environmental6/5/2020 6/5/2020 PASS
DetailsZach Conde
PER ZACH: Passed on ePlan with this comment: "Approved with grease abatement as shown." Please pass on Tidemark.

Plan Modification Accepted  5/29/2020 DONE
Signage plans were added to show were signage needs to be installed
BLD-Conference5/27/20205/28/20205/28/2020PPASS
DetailsTony Young
Job-site overview conference meet and greet. Please contact Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// scope of work meeting
Issue PAID IN FULL permit  5/12/2020 DONE
Print Occupancy Form  5/12/2020 DONE
OVERRIDE  4/22/2020  
Permit Ready to Issue  4/22/2020 DONE
MET Matt Forrester (emailed fees & info on ACHD)
GC FORM
REVISED VALUE
ACHD
Plan assigned to (CDM)2/21/20202/21/20204/21/2020 PASS
DetailsCarl D Madsen
Washington Elementary
PLANS/APPL TAKEN TO FRONT DESK  4/21/2020 DONE
Routing Off Site - STRUCTURAL4/17/2020 4/21/2020 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL3/23/2020 4/21/2020 FAIL
DetailsCarl D Madsen
Routing - MECHANICAL4/20/2020 4/20/2020 PASS
DetailsTroy James
Routing - PUBLIC WORKS3/27/2020 3/27/2020 PASS
DetailsMorgan Webb
Routing PW Sewer Design3/25/2020 3/25/2020 PASS
DetailsDeAnn Brown
Routing - MECHANICAL3/23/2020 3/25/2020 FAIL
DetailsTroy James
Previous corrections have not been resolved. Unable to find any response letter. Talked to mechanical engineer. He was going to look into it
Routing PW Street Lights3/24/2020 3/24/2020 PASS
DetailsTom Marshall
Routing - PLAN CHECK3/23/2020 3/23/2020 PASS
DetailsCarl D Madsen
Route to Impact Fee Review3/4/20203/7/20203/5/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE2/21/20202/21/20203/4/2020 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL2/21/2020 3/4/2020 FAIL
DetailsCarl D Madsen
Stapley
Routing - PLANNING2/21/2020 3/4/2020 PASS
DetailsCarl D Madsen
1st review completed  3/4/2020 DONE
Routing PW Sewer Design2/21/2020 3/3/2020 FAIL
DetailsDeAnn Brown
Refer to changemarks on sheet C5.00
Routing PW Solid Waste2/21/2020 3/2/2020 PASS
DetailsEvan Carpenter
Current solid waste enclosure design is approved for a single dumpster.
Routing - PLAN CHECK2/21/2020 2/29/2020 FAIL
DetailsCarl D Madsen
Routing - MECHANICAL2/21/2020 2/27/2020 FAIL
DetailsTroy James
See eplan
Routing PW Drainage2/21/2020 2/26/2020 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS2/21/2020 2/25/2020 PASS
DetailsCandy A. Nichols
CREDIT FOR DEMO
Routing - Erosion and Sediment2/21/2020 2/25/2020 PASS
DetailsMichael Zawacki
Routing - Addressing2/21/2020 2/24/2020 PASS
DetailsDoug Chausow
Routing - PLUMBING2/21/2020 2/24/2020 PASS
DetailsDaryl Spivey
See redline notes and per plan and ISPC.
Routing - ELECTRICAL2/21/2020 2/21/2020 PASS
DetailsJavier Guzman
Routing - Design Review2/21/2020 2/21/2020 PASS
DetailsKayCee Babb
No Design Review required. Comply with all drawings on file and conditions of approval of CUP19-00076.
Routing PW Environmental2/21/2020 2/21/2020 PASS
DetailsRick Christenson
Approved with grease interceptor as shown.
Routing PW Street Lights2/21/2020 2/21/2020 FAIL
DetailsTom Marshall
Intake Approval  2/20/2020 PASS
Application received  2/5/2020 DONE
Application submitted via PDS Online on Feb 5 2020 3:59PM