BLD-Foundation | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | PEND |
Tony Young
|
|
|
Grout/Rebar/Masonry inspection request along B grid line. Grouting 35 to 38 feet at 2pm. Dividing wall in the gym between mechanical room 4'' to 8''. MTI scheduled as well. Phone #: ###-#### Inspection requested via web by Dan Koski
|
BLD-Foundation | 8/7/2020 | 8/7/2020 | 8/10/2020 | P | PEND |
Tony Young
|
|
|
24-27 foot masonry/rebar grout inspection request. Placing at 2pm today. MTI is scheduled as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
|
BLD-Foundation | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PART |
Tony Young
|
|
|
20-24 foot lift of Masonry for the gym addition. Rebar/Masonry inspection request. MTI will be on site as well. Grout is at 2pm. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// masonary pending special inspection.. ?s on shafts.. need to maintain fire wall ratings
|
BLD-Foundation | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PEND |
Tony Young
|
|
|
Masonry/Rebar inspection request for 16 to 20 foot masonry at the new gym. MTI is scheduled to be on site as well. Call Dan with any issues. Grout is at 2pm. Phone #: ###-#### Inspection requested via web by Dan Koski// pending S.I
|
BLD-Foundation | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PEND |
Dave Hannah
|
|
|
Masonry/Rebar inpsection request for new gym. Remaining 12 to 16 feet of masonry being grouted at 2pm. MTI scheduled to be on site as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski ok grout after spec inspection aproves
|
BLD-Foundation | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PART |
Jim Storey
|
|
|
Masonry/Rebar inspection request for the new gym addition. Grouting at 2pm from 12 to 16 feet. MTI will be on site as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski/// ok pending special inspection report
|
BLD-Foundation | 7/27/2020 | 7/28/2020 | 7/28/2020 | P | PART |
Tony Young
|
|
|
Grout/Rebar inspection request for Masonry. New gym addition 8 to 12 foot section scheduled for 1pm. Call Dan with any issues. MTI on site as well. Phone #: ###-#### Inspection requested via web by Dan Koski// ok pending special inspection report
|
BLD-Foundation | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PEND |
Tony Young
|
|
|
Rebar/Masonry Inspection request. Grout is at 2pm. MTI is scheduled as well. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski/// pending special inspection
|
BLD-Foundation | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | PART |
Tony Young
|
|
|
Rebar/Masonry inspection request. I didn''t know if Tony was going to want to look at rebar for the structural block in the gym. Grout is scheduled for 3pm. Please call Dan if there are any issues. MTI is on the books as well. Phone #: ###-#### Inspection requested via web by Dan Koski/// work in progress,, pending special inspection
|
BLD-Concrete | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PART |
Brandon Shaw
|
|
|
VB and Rebar inspection request for the new addition gym slab. Scheduled to place Monday. Special inspection will perform rebar and concrete as well. special inspection personal on site,, pending approvals...
|
BLD-Foundation | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Brandon Shaw
|
|
|
Stem wall placement for the gym. Grids A-B, 1-7. Rebar inspection... Pending special inspection...
|
BLD-Footing | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PART |
Tony Young
|
|
|
Footing rebar inspection request for the Gymnasium Addition. Grids 1-7 and Grids A-B. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// special inspection personal on site,, pending approvals
|
OVERRIDE | | | 6/15/2020 | | |
|
|
|
|
Plan assigned to (CDM) | 5/29/2020 | 5/29/2020 | 6/15/2020 | | PASS |
Carl D Madsen
|
|
|
plan mod
|
Routing - PLAN CHECK | 6/5/2020 | | 6/15/2020 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 6/15/2020 | | DONE |
|
|
|
PLAN MOD MET
|
CHANGE STATUS TO (ISS) | | | 6/15/2020 | | DONE |
|
|
|
plan mod
|
Routing - PUBLIC WORKS | 6/5/2020 | | 6/5/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 6/5/2020 | | 6/5/2020 | | PASS |
Brian Murphy
|
|
|
new pipe elevation into bed
|
Routing PW Environmental | 6/5/2020 | | 6/5/2020 | | PASS |
Zach Conde
|
|
|
PER ZACH: Passed on ePlan with this comment: "Approved with grease abatement as shown." Please pass on Tidemark.
|
Plan Modification Accepted | | | 5/29/2020 | | DONE |
|
|
|
Signage plans were added to show were signage needs to be installed
|
BLD-Conference | 5/27/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Tony Young
|
|
|
Job-site overview conference meet and greet. Please contact Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// scope of work meeting
|
Issue PAID IN FULL permit | | | 5/12/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/12/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/22/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 4/22/2020 | | DONE |
|
|
|
MET Matt Forrester (emailed fees & info on ACHD)
GC FORM
REVISED VALUE
ACHD
|
Plan assigned to (CDM) | 2/21/2020 | 2/21/2020 | 4/21/2020 | | PASS |
Carl D Madsen
|
|
|
Washington Elementary
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2020 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2020 | | 4/21/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/23/2020 | | 4/21/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 4/20/2020 | | 4/20/2020 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2020 | | 3/27/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Design | 3/25/2020 | | 3/25/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing - MECHANICAL | 3/23/2020 | | 3/25/2020 | | FAIL |
Troy James
|
|
|
Previous corrections have not been resolved. Unable to find any response letter. Talked to mechanical engineer. He was going to look into it
|
Routing PW Street Lights | 3/24/2020 | | 3/24/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 3/23/2020 | | 3/23/2020 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 3/4/2020 | 3/7/2020 | 3/5/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/21/2020 | 2/21/2020 | 3/4/2020 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 2/21/2020 | | 3/4/2020 | | FAIL |
Carl D Madsen
|
|
|
Stapley
|
Routing - PLANNING | 2/21/2020 | | 3/4/2020 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/4/2020 | | DONE |
|
|
|
|
Routing PW Sewer Design | 2/21/2020 | | 3/3/2020 | | FAIL |
DeAnn Brown
|
|
|
Refer to changemarks on sheet C5.00
|
Routing PW Solid Waste | 2/21/2020 | | 3/2/2020 | | PASS |
Evan Carpenter
|
|
|
Current solid waste enclosure design is approved for a single dumpster.
|
Routing - PLAN CHECK | 2/21/2020 | | 2/29/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 2/21/2020 | | 2/27/2020 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing PW Drainage | 2/21/2020 | | 2/26/2020 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 2/21/2020 | | 2/25/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO
|
Routing - Erosion and Sediment | 2/21/2020 | | 2/25/2020 | | PASS |
Michael Zawacki
|
|
|
|
Routing - Addressing | 2/21/2020 | | 2/24/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 2/21/2020 | | 2/24/2020 | | PASS |
Daryl Spivey
|
|
|
See redline notes and per plan and ISPC.
|
Routing - ELECTRICAL | 2/21/2020 | | 2/21/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 2/21/2020 | | 2/21/2020 | | PASS |
KayCee Babb
|
|
|
No Design Review required. Comply with all drawings on file and conditions of approval of CUP19-00076.
|
Routing PW Environmental | 2/21/2020 | | 2/21/2020 | | PASS |
Rick Christenson
|
|
|
Approved with grease interceptor as shown.
|
Routing PW Street Lights | 2/21/2020 | | 2/21/2020 | | FAIL |
Tom Marshall
|
|
|
|
Intake Approval | | | 2/20/2020 | | PASS |
|
|
|
|
Application received | | | 2/5/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2020 3:59PM
|