Permit Ready to Issue | | | 7/24/2020 | | DONE |
|
|
|
All Met
** DO NOT RE-ISSUE - - PLAN MOD **
|
Plan assigned to (JAB) Josh | 6/24/2020 | 6/24/2020 | 7/23/2020 | | PASS |
Josh Bogle
|
|
|
07/06 modification - under review by JAB
|
Routing - PLAN CHECK | 6/30/2020 | | 7/23/2020 | | PASS |
Josh Bogle
|
|
|
fee per added value
|
Plan Reviewer's activity | | | 7/17/2020 | | DONE |
Josh Bogle
|
|
|
video conference with Robert, asked for a floor plan and another Sectio Vew - talked WUI
|
Routing - PLANNING | 6/30/2020 | | 7/1/2020 | | PASS |
Sue Cummings
|
|
|
No ADU approval with this permit
|
Plan Modification Accepted | | | 6/24/2020 | | DONE |
|
|
|
Plan Mod to enclose existing carport.
Paper to ePlan, cannot locate original plans, thankfully plan mod does not effect original plans. Route to JAB & Planning
|
BLD-Framing/Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
Plan assigned to (JAB) Josh | 2/7/2020 | 2/7/2020 | 2/10/2020 | | PASS |
Josh Bogle
|
|
|
02/13 remodel, paper
|
Routing - PLAN CHECK | 2/10/2020 | | 2/10/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/10/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/10/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/10/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 2/10/2020 | | DONE |
|
|
|
Verify if owner will be acting as GC or if GC needed
|
Telephone call | | | 2/10/2020 | | DONE |
|
|
|
Called and spoke with Robert to let him know that his permit is ready for pick up, what the fees are, and that we'll need clarification on whether he's going to be the GC or not.
|
Issue PAID IN FULL permit | | | 2/10/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/7/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Application received | | 2/7/2020 | | | |
|
|
|
|