BLD-Other | 8/11/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Jim Storey
|
|
|
North Canopy inspection, review of east side excavation footings
AM or PM is OK Phone #: ###-#### Inspection requested via web by Mark Coiner
|
BLD-Other | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | PASS |
Brandon Shaw
|
|
|
Framing, OK to install roof...
|
BLD-Other | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Jim Storey
|
|
|
Storefront entry inspection, new entry awning installation inspection AM or PM is fine Mark Coiner Phone #: ###-#### Inspection requested via web by Mark Coiner strucral ok
|
BLD-Footing | 6/22/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Jim Storey
|
|
|
North side of existing building SOG for canopy install footing and slab steel inspection Phone #: ###-#### Inspection requested via web by Mark Coiner
|
BLD-Foundation | 6/22/2020 | 6/23/2020 | 6/23/2020 | P | PASS |
Jim Storey
|
|
|
footing steel and SOG steel inspection Phone #: ###-#### Inspection requested via web by Mark Coiner
|
Issue PAID IN FULL permit | | | 6/5/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/29/2020 | | DONE |
|
|
|
Emailed applicant and inform them we still need a 302, 306 and something from ACHD prior to the issuance of this project.
|
Plan assigned to (CDM) | 2/21/2020 | 2/21/2020 | 5/28/2020 | | PASS |
Carl D Madsen
|
|
|
DID2 Canopies L-3
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/28/2020 | | DONE |
|
|
|
met
NEED: ACHD
(tbenson@shradermartinez.com and mcoiner@shradermartinez.com)
All Met
GC FORM
REVISED VALUE
|
Routing Off Site - STRUCTURAL | 5/8/2020 | | 5/26/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/19/2020 | | 5/26/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2020 | | 4/30/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 4/3/2020 | 4/3/2020 | 4/26/2020 | | PASS |
Greg Ruxton
|
|
|
Comments attached to case.
|
Routing Off Site - STRUCTURAL | 4/3/2020 | | 4/10/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/3/2020 | | 4/10/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 4/3/2020 | | 4/6/2020 | | PASS |
Dan Ediger
|
|
|
per plans and ISPC
|
Route to Impact Fee Review | 3/17/2020 | 3/20/2020 | 3/19/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/21/2020 | 2/21/2020 | 3/17/2020 | | FAIL |
Greg Ruxton
|
|
|
Attached comments to case and emailed applicant.
|
1st review completed | | | 3/17/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 2/21/2020 | | 3/12/2020 | | FAIL |
Carl D Madsen
|
|
|
Stapley
|
Routing - PLAN CHECK | 2/21/2020 | | 3/12/2020 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 2/21/2020 | | 2/26/2020 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 2/21/2020 | | 2/25/2020 | | PASS |
Michael Zawacki
|
|
|
No esc needed
|
Routing - PLANNING | 2/21/2020 | | 2/24/2020 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 2/21/2020 | | 2/24/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 2/21/2020 | | 2/24/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/21/2020 | | 2/21/2020 | | FAIL |
Dan Ediger
|
|
|
Missing pages and water isometric drawing
|
Intake Approval | | | 2/20/2020 | | PASS |
|
|
|
|
Intake Approval | | | 2/11/2020 | | FAIL |
Julie Romig
|
|
|
John,
To complete your application, please provide the following:
1. Signature on structural calcs (Design calcs from A&A Engineering are stamped but not signed);
2. Leave a 4"x2" blank space in the lower right hand corner, located 3" off the right sheet edge, on every drawing per ePlanReview submittal standards;
3. Provide Lighting COMcheck for new lighting.
Thank you,
Julie Romig
2/11/2020
|
Application received | | | 2/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2020 3:54PM
|