BLD-Final | 6/19/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Mike Jordan
|
|
|
If you can make it before 11a.m. I Have the final home owner walk at 11 a.m. and try not to have anyone in the home during the walk. If you cant make it out before then I can reschedule for Monday.
Thank you Phone #: ###-#### Inspection requested via web by Allen Jones
|
DOC - Permit Finaled | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 6/19/2020 | 6/19/2020 | 6/19/2020 | A | DONE |
Mike Jordan
|
|
|
5.2
|
BLD-Framing/Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Mike Jordan
|
|
|
Covered Patio Back of House. Plans on Kitchen Counter Phone #: ###-#### Inspection requested via web by Allen Jones
|
BLD-Footing | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Mike Jordan
|
|
|
As late as possible Phone #: 5084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Tell Riley
|
|
|
Screened- Allen Phone #: ###-####//meets rescheck requirements//framing corrections made//
|
BLD-Energy code compliance | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | NR |
Mike Jordan
|
|
|
screened // Alan Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2020 | 4/21/2020 | 4/21/2020 | A | FAIL |
Mike Jordan
|
|
|
screened // Alan Phone #: ###-####. All framing issues corrected except for lateral bracing on A07 trusses.
|
BLD-Framing/Rough-in | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Allen Jones. Complete lateral bracing on A07 trusses. Provide additional purlin on top chords of A07 trusses in garage were OSB sheathing for roof has been omitted. Provide additional stud under top plate break on racked wall and also provide plate connection at corner. (single top plate.) Appears that A06 and A06A trusses are placed in incorrect lay out. Provide fix. Provide additional roll blocking at top of raised heal trusses at front patio area. Ok to insulate. Correction notice posted.
|
OVERRIDE | | | 3/20/2020 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/20/2020 | | DONE |
Debbie Sanine
|
|
|
No residential plan mod review fee
|
CHANGE STATUS TO (ISS) | | | 3/20/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/20/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Plan assigned to (D_S) Debbie | 3/19/2020 | 3/19/2020 | 3/19/2020 | | DONE |
Debbie Sanine
|
|
|
plan mod
|
Routing - PLAN CHECK | 3/19/2020 | | 3/19/2020 | | PASS |
Debbie Sanine
|
|
|
|
Plan Modification Accepted | | | 3/19/2020 | | DONE |
|
|
|
Allen Jones from Hayden Homes emailed requesting a plan mod for patio engineering.
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Mike Jordan
|
|
|
Zane Phone #: ###-####
|
BLD-Foundation | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Mike Jordan
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 2/24/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/14/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 2/13/2020 | 2/13/2020 | 2/14/2020 | | DONE |
Debbie Sanine
|
|
|
|
Plan Reviewer's activity | | | 2/14/2020 | | DONE |
Debbie Sanine
|
|
|
Patio will come in as a Plan Mod once engineering calculations are received.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/14/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 2/12/2020 | | 2/14/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 2/14/2020 | | DONE |
Debbie Sanine
|
|
|
|
Route to Impact Fee Review | 2/12/2020 | 2/15/2020 | 2/13/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 2/12/2020 | | 2/13/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 2/12/2020 | | 2/13/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Application received | | | 2/12/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 12 2020 8:53AM
|
Plan assigned to (BJM) | 2/12/2020 | 2/12/2020 | 2/12/2020 | | DEFR |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 2/12/2020 | | 2/12/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 2/12/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 2/12/2020 | | 2/12/2020 | | PASS |
Jeff Lowe
|
|
|
|