BLD-Footing | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Brandon Shaw
|
|
|
Shed...
|
Permit Ready to Issue | | | 7/24/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
CHANGE STATUS TO (ISS) | | | 7/24/2020 | | DONE |
|
|
|
|
Plan assigned to (D_S) Debbie | 7/23/2020 | 7/23/2020 | 7/23/2020 | | DONE |
Debbie Sanine
|
|
|
7/29/20 - plan mod
|
Routing - PLAN CHECK | 7/23/2020 | | 7/23/2020 | | PASS |
Debbie Sanine
|
|
|
No Building Review Plan Mod Fee to be charged
|
Plan Modification Accepted | | | 7/23/2020 | | DONE |
|
|
|
Mitchell called requesting a modification to the foundation
|
CHANGE STATUS TO (ISS) | | | 7/17/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/17/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2020 | | DONE |
|
|
|
|
BLD-Foundation | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Brandon Shaw
|
|
|
Screened- Francis- foundation wall inspection Phone #: ###-####
|
Application received | | 7/16/2020 | 7/16/2020 | | DONE |
|
|
|
Applicant better explained scope of work on 2/15/2020
|
Plan assigned to (D_S) Debbie | 7/8/2020 | 7/8/2020 | 7/16/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 7/16/2020 | | 7/16/2020 | | PASS |
Sue Cummings
|
|
|
signed off per ePlan
|
Permit Ready to Issue | | | 7/16/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
CHANGE STATUS TO (REV) | | | 7/16/2020 | | DONE |
|
|
|
plan mod routing for planning has not passed, not sure why it was sent to fee status
|
BLD-Footing | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PART |
Brandon Shaw
|
|
|
Footing for kitchen addition only...
|
Routing - PLANNING | 7/15/2020 | | 7/15/2020 | | FAIL |
Sue Cummings
|
|
|
Still no corrections made. Please do NOT send this in again without corrections
|
Routing - PLANNING | 7/10/2020 | | 7/10/2020 | | FAIL |
Sue Cummings
|
|
|
correction not made.
|
Routing - PLAN CHECK | 7/10/2020 | | 7/10/2020 | | PASS |
Debbie Sanine
|
|
|
ESC-N Energy-Y
|
Plan Reviewer's activity | | | 7/10/2020 | | DONE |
Debbie Sanine
|
|
|
Building Review Plan Mod fee of 1 hour to be charged
|
Routing - PLANNING | 7/10/2020 | | 7/10/2020 | | FAIL |
Sue Cummings
|
|
|
Still no corrections made
|
Routing - PLAN CHECK | 7/8/2020 | | 7/8/2020 | | FAIL |
Debbie Sanine
|
|
|
plan mod
|
Routing - PLANNING | 7/8/2020 | | 7/8/2020 | | FAIL |
Sue Cummings
|
|
|
plan mod
Site plan needs to show 10 ft. from property line to new wall construction. The eves may incroach 2 ft. into setback
|
Plan Modification Accepted | | | 7/8/2020 | | DONE |
|
|
|
Applicant requested modification to add a shed addition to side of property. Route to Planning & Building.
Paper to ePlan modification
|
Plan assigned to (D_S) Debbie | 2/27/2020 | 2/27/2020 | 2/28/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 2/28/2020 | | 2/28/2020 | | PASS |
Debbie Sanine
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2020 | | DONE |
Debbie Sanine
|
|
|
|
Case Summary (BLD) | | | 2/28/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 2/28/2020 | | DONE |
|
|
|
met
|
Telephone call | | | 2/28/2020 | | DONE |
|
|
|
Spoke with Amaura about permit being ready and fees due
|
Issue PAID IN FULL permit | | | 2/28/2020 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 2/13/2020 | 2/13/2020 | 2/27/2020 | | DEFR |
Brian McGowan
|
|
|
02/17- SFD Addition from front counter - paper
|
1st review completed | | | 2/27/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing Walk-In (Zoning) | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Crystal Rain
|
|
|
|
Routing Walk-In (Zoning) | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 2/12/2020 | | | |
|
|
|
|