Permit Information
Permit NumberBLD20-00466
StatusIssued
Name FALASH & COMPANY INC
Site Address 3059 W CRESCENT RIM DR Unit: 404
Project Name3059 Crescent Rim Drive
Customer Number 
ePlanReviewYes
Description
(CRESCENT RIM BUILDINGS #2 - SUITE #404) Permit to remodel an existing 2,295 square foot dwelling unit located on the 4th story of an existing multi-family residential building. Work to include: new interior nonstructural walls, relocating an existing gas fireplace... The work is required to comply with the approved drawings, with the Structural Engineer’s design, with the plan review report, and with all applicable codes and ordinances. The 1-hr fire-resistance-rating of roof-ceiling assemblies, bearing walls, bearing columns and beams, dwelling unit separation walls and floors, etc. is required to be maintained or provided. This building is fully fire sprinkered with an NFPA 13 system for area and story increase. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/12/20208/12/20208/12/2020PNR
DetailsTell Riley
SCREENED // Greg Phone #: ###-####//used as conference//
Issue PAID IN FULL permit  5/12/2020 DONE
Inspection Record Card- Bld  5/12/2020 DONE
Permit Ready to Issue  5/11/2020 DONE
MET
GC Form
Revised Cert of Value
Plan assigned to (JAR)3/9/20203/9/20205/8/2020 DONE
DetailsJulie Romig
05/08 (10 days) - 2nd Rev - 1st Rev Comp - L3 Crescent Rim Condo Remodel
PLANS/APPL TAKEN TO FRONT DESK  5/8/2020 DONE
Routing - PLAN CHECK5/8/2020 5/8/2020 PASS
DetailsJulie Romig
3rd Review
Routing - PLAN CHECK4/27/2020 5/7/2020 FAIL
DetailsJulie Romig
2nd Rev
Route to Impact Fee Review4/19/20204/22/20204/20/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  4/19/2020 FAIL
DetailsJulie Romig
Routing - PLAN CHECK3/9/2020 4/19/2020 FAIL
DetailsJulie Romig
Routing - FIRE3/9/20203/9/20204/1/2020 PASS
DetailsErika Akin
No comments attached. Modification to the exisiting sprinkler system may be required for the improvements planned. The plans shall be reviewed by a licensed Idaho sprinkler contractor to determine modification necessary to provide required coverage. The sprinkler system shall comply with NFPA 13 and the fire alarm sytem with NFPA 72.Seperate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification on the fire protection systems.
Routing - MECHANICAL3/9/2020 3/16/2020 PASS
DetailsTroy James
Field verify any mechanical work
Routing - Addressing3/9/2020 3/11/2020 PASS
DetailsDoug Chausow
Routing - PLUMBING3/9/2020 3/10/2020 PASS
DetailsDaryl Spivey
Routing - PUBLIC WORKS3/9/2020 3/9/2020 PASS
DetailsCandy A. Nichols
NO NEW FEES
Intake Approval  3/5/2020 PASS
DetailsJulie Romig
Prescreen passed by JAR.
Intake Approval  3/2/2020 FAIL
DetailsJulie Romig
2. It appears that there will be penetrations through either the rated party wall or rated horizontal assembly (either above or below) in order to put in the new gas fire place. Provide UL listed penetration details for this and any other new penetrations through the rated walls or rated horizontal assemblies.
3. Wall construction type of new walls (sections/details). Provide UL listed rated assembly where constructing new walls around existing building elements required to be protected for Type VA construction. This includes the columns, which are being exposed. Columns are required to be individually encased. Please provide UL listed assemblies.
Intake Approval  2/14/2020 FAIL
DetailsJulie Romig
To complete your application, please provide the following:
1. Completed and signed 520 Application (download the PDF application here: https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/commercial-construction-500/520-major-tenant-improvement/)
2. Identify locations of rated assemblies (building elements, dwelling separation walls, corridor walls, rated horizontal assemblies) on plans. Provide penetration details, wall sections/details, ceiling details, etc showing how the rated assemblies are maintained.
3. Wall construction type of new walls (sections/details). Provide UL listed rated assembly where constructing new walls around existing building elements required to be protected for Type VA construction.
4. Ceiling details showing construction of new ceilings.
5. Door hardware schedule for user passage doors.
6. Address the Type B accessibility requirements showing required clearances in plan and interior elevations.
7. Provide lighting fixture schedule showing compliance with 2015 IECC lighting requirements for multi-family dwelling unit (can comply with either commercial or residential requirements).

Record drawings can be request from Planning & Development Services for reference (ask for BLD06-02322):
https://www.cityofboise.org/departments/finance-and-administration/city-clerk/public-records/public-records-access-research-request/
Application received  2/13/2020 DONE
Application submitted via PDS Online on Feb 13 2020 4:33PM