BLD-Final | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Tell Riley
|
|
|
Revised approved planset is on-site this time. Our apologies! Phone #: ###-#### Inspection requested via web by Sarah Schuller
|
DOC - Permit Finaled | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Tell Riley
|
|
|
new layout shows panels extending to the eave line on both arrays//
|
BLD-Final | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | FAIL |
Tell Riley
|
|
|
Please see revised approved planset that correctly reflects the installation. Phone #: ###-#### Inspection requested via web by Sarah Schuller//new plans were not onsite, looked around ele panel, front door, also looked in document file associated with permit//will need to have plans onsite for the isnpection//
|
Plan assigned to (JAB) Josh | 4/8/2020 | 4/8/2020 | 4/13/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/13/2020 | | 4/13/2020 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/13/2020 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 4/13/2020 | | DONE |
|
|
|
|
Routing - FRONT DESK | 4/10/2020 | | 4/10/2020 | | PASS |
Sue Cummings
|
|
|
Still good
|
Plan Modification Accepted | | | 4/8/2020 | | DONE |
|
|
|
plan mod workflow requested by Sarah Schuller from Cascade Builders.
|
BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | NR |
Tell Riley
|
|
|
Please call Darren one hour in advance if you would like him to be there for inspection. Thanks! Phone #: ###-#### Inspection requested via web by Sarah Schuller//need to have fire setback on east side approved, panels extend to the edge of the eave, plans show a 36" setback from eave for access//
|
Issue PAID IN FULL permit | | | 3/2/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/20/2020 | 2/20/2020 | 2/28/2020 | | PASS |
Josh Bogle
|
|
|
02/26 PV, ePlan - 1st done
|
Routing - PLAN CHECK | 2/28/2020 | | 2/28/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 2/28/2020 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 2/20/2020 | | 2/21/2020 | | FAIL |
Josh Bogle
|
|
|
no roof framing info provided
|
Routing - PLANNING | 2/20/2020 | | 2/21/2020 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 2/21/2020 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 2/20/2020 | | PASS |
|
|
|
|
Intake Approval | | | 2/14/2020 | | FAIL |
|
|
|
On the plot plan it states IRC 2012, we need all IRC information to IRC 2015.
|
Application received | | | 2/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2020 4:58PM
|