Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-00514
StatusIssued
Name SI CONSTRUCTION LLC
Site Address 6303 W TIERRA LN
Project NameLot 12 Unit C
Customer NumberBLD20-00514, BLD20-00516-00517
ePlanReviewYes
Description
(THREE PERMITS FILED UNDER BLD20-00514) Permit for the construction of a new 1661 sq. ft., 2 story (first story 1023 sq. ft., second story 638 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 64 sq. ft. of covered patio/porch and a 520 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-2D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/10/20208/11/20208/11/2020APASS
DetailsMike Jordan
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. All framing issues corrected. ok to insulate.
BLD-Framing/Rough-in8/3/20208/4/20208/4/2020AFAIL
DetailsMike Jordan
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Fireblock at ceiling level 1st. an d2nd. floors between staggered stud 2hr. wall. Provide putty pads on back to back electrical boxes. Provide letter from engineer deleting straps. Remove all foam from top plates and firecaulk, also firecaulk penetrations. C/N posted.
BLD-Other6/18/20206/19/20206/19/2020APASS
DetailsMike Jordan
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. 5/8 type x rock for fire walls at exterior locations and prerock areas.
BLD-Wall Bracing6/15/20206/16/20206/16/2020APASS
DetailsMike Jordan
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Exterior shear only ok. Also met with contractor to discuss firewall issues.
BLD-Wall Bracing6/10/20206/12/20206/12/2020APART
DetailsMike Jordan
Phone #: 2088703262 >> Inspection requested via mobile web by Lucas Eells. Needs to install all missed floor to floor straps, nail missed areas. Also noted issues with installed sheet rock for fire walls as well as continuity issues that need to be addressed prior to proceeding.
Fees Due Hold5/8/2020 5/11/2020 DONE
Details
Plan Modification Accepted  5/7/2020 DONE
Brandon requested the workflow to be opened for new Manual J's.
Routing - MECHANICAL5/7/2020 5/7/2020 PASS
DetailsTroy James
BLD-Foundation4/10/20204/13/20204/13/2020PPART
DetailsMike Jordan
Pat *left voicemail* Phone #: ###-####
BLD-Footing4/9/20204/10/20204/10/2020PPART
DetailsMike Jordan
screened // Pat Phone #: ###-####
Issue PAID IN FULL permit  4/8/2020 DONE
Inspection Record Card- Bld  4/8/2020 DONE
OVERRIDE  3/13/2020  
Plan assigned to (RDP)2/20/20202/20/20203/13/2020 DONE
DetailsRob Patrick
1st Review Complete: 03/06 Failed...03/10 sfd L2 ePlan Townhouse
Telephone call  3/13/2020 DONE
emailed applicant to let them know we need a GC form before issuance
Routing - PLAN CHECK3/13/2020 3/13/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  3/13/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  3/13/2020 DONE
met: bsheltrown@hbarchitecture.com

Need GC Form
1st review completed  3/6/2020 FAIL
DetailsRob Patrick
Routing - PLAN CHECK2/20/2020 3/6/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Route to Impact Fee Review2/20/20202/23/20202/21/2020 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS2/20/2020 2/21/2020 PASS
DetailsCandy A. Nichols
TOWNHOUSE
Plans ACCEPTED BY PLAN TECH  2/20/2020 DONE
Recd Pcfee & Taken To Pln CK  2/20/2020 DONE
Intake Approval  2/20/2020 PASS
Routing - MECHANICAL2/20/2020 2/20/2020 PASS
DetailsTroy James
Routing - PLANNING2/20/2020 2/20/2020 PASS
DetailsJosh Wilson
Routing - Addressing2/20/2020 2/20/2020 PASS
DetailsDoug Chausow
Application received  2/18/2020 DONE
Application submitted via PDS Online on Feb 18 2020 3:10PM