Permit Information
Permit NumberBLD20-00520
StatusIssued
Name GRANITE CONTRACTING LLC
Site Address 2983 N LANCASTER PL
Project Name Ihli Residence
Customer Number 
ePlanReviewYes
Description
***W.U.I. HILLSIDE LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED****** Permit for the construction of a new 3420 sq. ft., two story (first story 1075 sq. ft., second story 1575 sq. ft, below grade 770 sq. ft.) single family dwelling with 5 bedrooms, 2.5 bathrooms, approximately 456 sq. ft. of covered patio/porch and a 820 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1B zoning and setbacks per planning. ***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation6/23/20206/24/20206/24/2020PPART
DetailsTony Young
Screened // Andy Phone #: ###-####// work in progress on garage and front entry walls,, ok
BLD-Footing6/19/20206/22/20206/22/2020APASS
DetailsJim Storey
screened // andy Phone #: ###-####
BLD-Foundation6/3/20206/4/20206/4/2020APART
DetailsTony Young
Andy *screened* Phone #: ###-####,, basement walls ok
BLD-Footing5/28/20205/29/20205/29/2020PPART
DetailsTony Young
Andy *screened* Phone #: ###-####.. lower section ok
PubWorks Subgrade Approval5/21/20205/21/20205/21/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  4/29/2020  
Plan assigned to (RDP)3/18/20203/18/20204/29/2020 DONE
DetailsRob Patrick
2nd Review Complete 04/23 Failed Sheet S-1 comments not addressed: 04/06 sfd L2 ePlan
Telephone call  4/29/2020 DONE
amitchc@msn.com sent email about fees
Issue PAID IN FULL permit  4/29/2020 DONE
Inspection Record Card- Bld  4/29/2020 DONE
Routing - PLAN CHECK4/29/2020 4/29/2020 PASS
DetailsRob Patrick
PLEASE ADD 4 HOURS OF REVIEWERS TIME TO CORRECT DWGS
PLANS/APPL TAKEN TO FRONT DESK  4/29/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  4/29/2020 DONE
Routing - PLAN CHECK4/24/2020 4/24/2020 FAIL
DetailsRob Patrick
Dwgs still need to version
Routing - PLAN CHECK4/23/2020 4/23/2020 FAIL
DetailsRob Patrick
Dwgs uploaded with incorrect file names.
Routing PW Grading-Hillside4/21/2020 4/21/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - PLANNING4/14/2020 4/14/2020 PASS
DetailsKevin Holmes
Passed per approved CFH20-00022
Routing - PLAN CHECK3/18/2020 4/7/2020 FAIL
DetailsRob Patrick
Corrections Req'd
1st review completed  4/7/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing PW Grading-Hillside3/18/2020 3/26/2020 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - FIRE3/18/20203/18/20203/20/2020 PASS
DetailsLee G Meredith
New SFH

Sprinklers are not required. All measurements are within limits.
Routing - PUBLIC WORKS3/18/2020 3/20/2020 PASS
DetailsCandy A. Nichols
Route to Impact Fee Review3/18/20203/21/20203/19/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plan Reviewer's activity  3/19/2020 DONE
Emailed Mitch requesting a Suez fire flow report.
Routing - Erosion and Sediment3/18/2020 3/18/2020 PASS
DetailsMichael Zawacki
Site prep inspection required.
Recd Pcfee & Taken To Pln CK  3/18/2020 DONE
Plans ACCEPTED BY PLAN TECH  3/18/2020 DONE
Intake Approval  3/18/2020 PASS
Routing - MECHANICAL3/18/2020 3/18/2020 PASS
DetailsChad Schwendiman
Routing - PLANNING3/18/2020 3/18/2020 FAIL
DetailsKevin Holmes
Needs approved category II hillside permit. Please submit with CFH20-00022 approval after appeal period has lapsed.
Routing - Addressing3/18/2020 3/18/2020 PASS
DetailsDoug Chausow
Intake Approval  3/16/2020 FAIL
2nd Prescreen 3-16-2020
1) Plan sheet 200102 -GraniteLancaster-S1 needs to be rotated
2)Documents need to be uploaded in the documents folder
3)if the BMP is for your Soils and Geotech Report it needs to be stamped and signed.
Intake Approval  3/12/2020 FAIL
1. Please provide the Soils and Geotechnical report
2. Please provide the Erosion & Sediment Control Plans
2.Please provide the Erosion & Sediment Narrative
3. All drawings in the drawings folder must be landscape.
Application received  2/18/2020 DONE
Application submitted via PDS Online on Feb 18 2020 5:28PM