Permit Information
Permit NumberBLD20-00523
StatusIssued
Name VERTICAL CORP
Site Address 781 W SANDSTONE CT
Project Name 
Customer Number 
ePlanReviewYes
Description
***04/20/20 PLAN MODIFICATION TO RELOCATE ORIGINALLY PERMITTED STAIRWAY, REMOVE AND REPLACE ROOF WITH ENGINEERED TRUSS SYSTEM, CHANGE 2ND LEVEL WALL HEIGHT FOM 7'-8" TO 8'-11 1/4", 2ND LEVEL FRONT BEDROON TO GET AN ADDITION. ***W.U.I. HILLSIDE LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for a remodel to include;..Basement Level: Addition of new Bedroom, Flex Room, Laundry Room and relocation of water heater. A new Window Well will also be added for egress.
Ground Level: Existing Laundry Room off of garage to be replaced with a new Powder Room.
Main Floor Level: Demo closet at front door and wall between living and dining rooms and add railing. Re-configure bathroom and bedrooms. Demo and re-configure kitchen. Demo step between Nook and Family Room and cut open floor for new stairway to basement. Demo a portion of existing back patio and add a 180 sq. ft. remodeled bathroom addition to Master Bedroom.
Existing Truss System: Modify existing Truss system to add new Trusses to raise ceiling and add W.U.I. compliant Skylight. Exterior: New Cedar Wrapped Window alteration on West Elevation. All work per plans, notes, engineering, & local code. Separate electrical, plumbing & mechanical permits required. **RDP** *** CAT I Hillside Permit; A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.***

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/5/20208/5/20208/7/2020 PEND
DetailsTony Young
BLD-Aging Inspection8/4/20208/4/20208/5/2020 PEND
DetailsTony Young
BLD-Conference6/29/20206/29/20206/29/2020PPART
DetailsTony Young
screened // call when on the way .... kent Phone #: ###-####?s on frame,, need plans to meet what is built via architect
Routing - MECHANICAL5/20/2020 5/20/2020 PASS
DetailsTroy James
ACCA report submitted
Permit Ready to Issue  4/21/2020 DONE
Plan Mod ***Originally paper. SIGN OFF IN EPLAN AFTER FEES ARE PAID***
CHANGE STATUS TO (ISS)  4/21/2020 DONE
Plan assigned to (RDP)4/8/20204/8/20204/20/2020 DONE
DetailsRob Patrick
Plan modification - paper to electronic
Routing - PLAN CHECK4/17/2020 4/20/2020 PASS
DetailsRob Patrick
PLEASE ADD 3 HOURS OF REVIEW TIME
PLANS/APPL TAKEN TO FRONT DESK  4/20/2020 DONE
DetailsRob Patrick
Plan Modification Accepted  4/8/2020 DONE
Plan modification requested to update interior stair layout and truss system. Plans originally submitted in person, check with Rob before re-routing to ensure all depts are represented.
BLD-Footing3/23/20203/23/20203/23/2020PPASS
DetailsJim Storey
BLD-Footing3/20/20203/23/20203/23/2020ANR
DetailsJim Storey
JEFF Phone #: ###-####
PubWorks Subgrade Approval3/20/20203/20/20203/20/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing3/13/20203/16/20203/16/2020ANR
DetailsBrandon Shaw
Need Geo subsoil submitted to and approved by PW...
BLD-Footing3/6/20203/9/20203/9/2020ANR
DetailsMike Jordan
Jeff Phone #: ###-####. Needs geo-tech soils report.
Plan assigned to (RDP)2/27/20202/27/20203/3/2020 DONE
DetailsRob Patrick
1st Review Complete: 02/28 Failed for corrections...02/28- L2 SFD Remodel from front desk
Routing - PLAN CHECK3/3/2020 3/3/2020 PASS
DetailsRob Patrick
Case Summary (BLD)  3/3/2020 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  3/3/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  3/3/2020 DONE
Inspection Record Card- Bld  3/3/2020 DONE
Telephone call  3/3/2020 DONE
Call out to Todd to let him know permit fees due and permit is ready
Issue PAID IN FULL permit  3/3/2020 DONE
Plan resubmittals received  3/2/2020 DONE
Katie with vertical construction submitting plans for resubmittal.
Routing - PLAN CHECK2/27/2020 2/28/2020 FAIL
DetailsRob Patrick
Corrections Req'd
1st review completed  2/28/2020 FAIL
DetailsRob Patrick
1st Review Complete: 02/28 Failed for corrections
Plan assigned to (BJM)2/19/20202/19/20202/27/2020 DEFR
DetailsBrian McGowan
02/28- L2 SFD Remodel from front desk
Routing - PUBLIC WORKS2/19/2020 2/24/2020 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside2/19/2020 2/24/2020 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Routing Walk-In (Zoning)2/19/20202/19/20202/19/2020APASS
DetailsSue Cummings
Routing Walk-In (BLD)2/19/20202/19/20202/19/2020APASS
DetailsBrian McGowan
Took in due to Hillside requirements
BLD-Framing/Rough-in8/13/20208/14/2020 A 
DetailsTony Young
Screened- KEnt Phone #: ###-####
Application received 2/19/2020