BLD-Aging Inspection | 8/5/2020 | 8/5/2020 | 8/7/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/4/2020 | 8/4/2020 | 8/5/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PART |
Tony Young
|
|
|
screened // call when on the way .... kent Phone #: ###-####?s on frame,, need plans to meet what is built via architect
|
Routing - MECHANICAL | 5/20/2020 | | 5/20/2020 | | PASS |
Troy James
|
|
|
ACCA report submitted
|
Permit Ready to Issue | | | 4/21/2020 | | DONE |
|
|
|
Plan Mod ***Originally paper. SIGN OFF IN EPLAN AFTER FEES ARE PAID***
|
CHANGE STATUS TO (ISS) | | | 4/21/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 4/8/2020 | 4/8/2020 | 4/20/2020 | | DONE |
Rob Patrick
|
|
|
Plan modification - paper to electronic
|
Routing - PLAN CHECK | 4/17/2020 | | 4/20/2020 | | PASS |
Rob Patrick
|
|
|
PLEASE ADD 3 HOURS OF REVIEW TIME
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2020 | | DONE |
Rob Patrick
|
|
|
|
Plan Modification Accepted | | | 4/8/2020 | | DONE |
|
|
|
Plan modification requested to update interior stair layout and truss system. Plans originally submitted in person, check with Rob before re-routing to ensure all depts are represented.
|
BLD-Footing | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | NR |
Jim Storey
|
|
|
JEFF Phone #: ###-####
|
PubWorks Subgrade Approval | 3/20/2020 | 3/20/2020 | 3/20/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | NR |
Brandon Shaw
|
|
|
Need Geo subsoil submitted to and approved by PW...
|
BLD-Footing | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Needs geo-tech soils report.
|
Plan assigned to (RDP) | 2/27/2020 | 2/27/2020 | 3/3/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete: 02/28 Failed for corrections...02/28- L2 SFD Remodel from front desk
|
Routing - PLAN CHECK | 3/3/2020 | | 3/3/2020 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 3/3/2020 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/3/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/3/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2020 | | DONE |
|
|
|
Call out to Todd to let him know permit fees due and permit is ready
|
Issue PAID IN FULL permit | | | 3/3/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/2/2020 | | DONE |
|
|
|
Katie with vertical construction submitting plans for resubmittal.
|
Routing - PLAN CHECK | 2/27/2020 | | 2/28/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 2/28/2020 | | FAIL |
Rob Patrick
|
|
|
1st Review Complete: 02/28 Failed for corrections
|
Plan assigned to (BJM) | 2/19/2020 | 2/19/2020 | 2/27/2020 | | DEFR |
Brian McGowan
|
|
|
02/28- L2 SFD Remodel from front desk
|
Routing - PUBLIC WORKS | 2/19/2020 | | 2/24/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 2/19/2020 | | 2/24/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (Zoning) | 2/19/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/19/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Brian McGowan
|
|
|
Took in due to Hillside requirements
|
BLD-Framing/Rough-in | 8/13/2020 | 8/14/2020 | | A | |
Tony Young
|
|
|
Screened- KEnt Phone #: ###-####
|
Application received | | 2/19/2020 | | | |
|
|
|
|