BLD-Other | 6/8/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit
|
BLD-Final | 6/5/2020 | 6/8/2020 | 6/8/2020 | A | NR |
Brandon Shaw
|
|
|
John *screened* Phone #: ###-####
|
BLD-Energy code compliance | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Brandon Shaw
|
|
|
Screened- John Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PART |
Brandon Shaw
|
|
|
Carport only...
|
BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Tell Riley
|
|
|
call owner ###-####//zoning document shows approved for 2'6" side setback and 12 front//appears to be 3' check when posts are installed/vertical construction begins//may need to rate soffits, nothing on plans for rated soffits, posts//footing depth ok//
|
BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 | A | DEFR |
Mike Jordan
|
|
|
moved to pm inspection.
|
BLD-Foundation | 3/25/2020 | 3/27/2020 | 3/27/2020 | A | CANC |
Mike Jordan
|
|
|
Brant Phone #: ###-####. Work in progress on retaing wall rebar. wrong entry.
|
BLD-Footing | 3/20/2020 | 3/24/2020 | 3/24/2020 | P | CANC |
Tell Riley
|
|
|
John Phone #: ###-####//not ready, said he will reschedule//
|
Plan assigned to (JAB) Josh | 3/13/2020 | 3/13/2020 | 3/18/2020 | | PASS |
Josh Bogle
|
|
|
03/19 addition, paper - 1st done
|
Routing - PLAN CHECK | 3/18/2020 | | 3/18/2020 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/18/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 3/18/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 3/18/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review, pending a Section view for the addition
|
Routing - PLAN CHECK | 3/13/2020 | | 3/13/2020 | | FAIL |
Josh Bogle
|
|
|
no Section View provided at mudroom addition, no footings noted
|
Routing Walk-In (Zoning) | 2/19/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Michaella Owens
|
|
|
|
Routing Walk-In (BLD) | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/19/2020 | | 2/19/2020 | | FAIL |
Josh Bogle
|
|
|
needs engineering and R302 details
|
1st review completed | | | 2/19/2020 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/19/2020 | | | |
|
|
|
|