First Notice | 5/21/2020 | 5/21/2020 | 7/9/2020 | | DONE |
Brandon Shaw
|
|
|
mailed 7-9-2020
|
BLD-Final | 5/21/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | FAIL |
Brandon Shaw
|
|
|
No permit or city approved plans, no access to site...
|
BLD-Footing | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PART |
Tell Riley
|
|
|
Dave **Cleared** Phone #: ###-####//pending specials//setbacks measured based on siteplan and relation to exsiting building//
|
OVERRIDE | | | 4/13/2020 | | |
|
|
|
|
Route to Impact Fee Review | 4/10/2020 | 4/13/2020 | 4/13/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (BJM) | 3/12/2020 | 3/12/2020 | 4/13/2020 | | DONE |
Brian McGowan
|
|
|
04/07- Suez Clorine Cntact Tank L-3
|
Issue PAID IN FULL permit | | | 4/13/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/13/2020 | | DONE |
|
|
|
Need
GC Form
Revised Value (see notes in fees, no fees due)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2020 | | DONE |
Brian McGowan
|
|
|
|
Routing Off Site - STRUCTURAL | 4/10/2020 | | 4/10/2020 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/9/2020 | | 4/9/2020 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 3/12/2020 | 3/12/2020 | 4/7/2020 | | PASS |
Greg Ruxton
|
|
|
04/07 Suez Chlorine tank L3 GJR
|
1st review completed | | | 4/7/2020 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/12/2020 | | 4/3/2020 | | FAIL |
Brian McGowan
|
|
|
All engineering must be in the 2015 Code cycle.
|
Routing - PLANNING | 3/12/2020 | | 3/13/2020 | | PASS |
Kevin Holmes
|
|
|
Passed per CAA20-00017
|
Routing - Addressing | 3/12/2020 | | 3/12/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/12/2020 | | 3/12/2020 | | PASS |
Candy A. Nichols
|
|
|
NO NEW PLUMBING
|
Routing - Erosion and Sediment | 3/12/2020 | | 3/12/2020 | | PASS |
Michael Zawacki
|
|
|
|
Routing - Design Review | 3/12/2020 | | 3/12/2020 | | PASS |
Josh Wilson
|
|
|
No review required- not in Design Review overlay.
|
Routing - PLUMBING | 3/12/2020 | | 3/12/2020 | | PASS |
Daryl Spivey
|
|
|
|
Routing PW Drainage | 3/12/2020 | | 3/12/2020 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 3/11/2020 | | PASS |
|
|
|
|
Application received | | | 2/19/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 19 2020 11:53AM
|
Intake Approval | | | 2/19/2020 | | FAIL |
|
|
|
1. Leave a 4"x4" blank space on the cover sheet G001 and a 4"x2" blank space on sheet C100. Locate blank space in the lower right hand corner, 3" off the right sheet edge.
2. ESC Waiver Request Letter.
|
Routing Off Site - STRUCTURAL | 3/12/2020 | | | | FAIL |
Brian McGowan
|
|
|
AHJ- Code cycle must show or state 2015 IBC conformity.
|