BLD-Final | 4/24/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Mike Jordan
|
|
|
Screened- Veronica Phone #: ###-####. OPk for temp occ. Will be ok for perm occ. once life/safety signs perm.
|
FIRE-Final Inspection | 4/23/2020 | 4/24/2020 | 4/24/2020 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is being given with Joe's permission for standard 90 days. Last item is the replacement and installation of a new electric gate with the required 20' clearance and opticon.
*screened* please call ahead for acces -Veronica or Jamie Phone #: ###-####
|
FIRE-Final Inspection | 3/3/2020 | 3/3/2020 | 3/4/2020 | P | FAIL |
Troy Cobbley
|
|
|
Repair or remove the exit signs, provide sticker and remove the thumbturn deadbolt at the main exit, remove the thumbturn dead bolt from the rear exit. I have contacted Joe Bruce to provide guidance on the facility gate that is only 15'-11" wide and has no Opticon or Knox box for fire dept entry.
(3/4/20 Per conversation with Joe Bruce a temp for life safety will be given but a letter stating intent to install the replacement electric gate needs to be provided stating time line, and code compliance such as functioning Opticon, 20' clearance......ECT.)
Jamie Phone #: ###-####
|
BLD-Final | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | FAIL |
Mike Jordan
|
|
|
Jamie Phone #: ###-####. Remove thumb turn from both doors. provide ADA bathroom sign.
|
Issue PAID IN FULL permit | | | 2/25/2020 | | DONE |
|
|
|
|
Plan assigned to (RMH) | 2/21/2020 | 2/21/2020 | 2/24/2020 | | PASS |
Ron Hill
|
|
|
02/25 - Extra Space Storage Office
|
Routing - PLAN CHECK | 2/19/2020 | | 2/24/2020 | | PASS |
Ron Hill
|
|
|
|
1st review completed | | | 2/24/2020 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2020 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/24/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/24/2020 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 2/19/2020 | 2/19/2020 | 2/21/2020 | | DEFR |
Julie Romig
|
|
|
|
Routing - Addressing | 2/21/2020 | | 2/21/2020 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2020 | | DONE |
|
|
|
|
Intake Approval | | | 2/19/2020 | | PASS |
|
|
|
|
Application received | | 2/19/2020 | | | |
|
|
|
|
Application received | | 2/19/2020 | | | |
|
|
|
|