BLD-Footing | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | NR |
Mike Jordan
|
|
|
Brooks Phone #: ###-####
|
BLD-Footing | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PEND |
Tony Young
|
|
|
Brooks Phone #: ###-####,, needs soils 1st
|
BLD-Footing | 3/3/2020 | 3/5/2020 | 3/5/2020 | P | PEND |
Tony Young
|
|
|
Brooks Phone #: ###-####,, needs soils approval 1st
|
BLD-Footing | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PEND |
Tony Young
|
|
|
Brooks Phone #: ###-####// needs hillside approval 1st
|
Issue PAID IN FULL permit | | | 2/26/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/25/2020 | | DONE |
|
|
|
Called and spoke with Brooks to let him know his permit is ready to be picked up.
|
Plan assigned to (JAB) Josh | 2/21/2020 | 2/21/2020 | 2/24/2020 | | PASS |
Josh Bogle
|
|
|
02/27 interior beam, paper
|
Routing PW Grading-Hillside | 2/21/2020 | | 2/24/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 2/21/2020 | | 2/24/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/24/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/24/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 2/24/2020 | | DONE |
|
|
|
met
|
Routing Walk-In (BLD) | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Josh Bogle
|
|
|
took in for Hillside routing
|
Application received | | 2/21/2020 | | | |
|
|
|
|