BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Jim Storey
|
|
|
screened // chris Phone #: ###-####
|
DOC - Permit Finaled | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Jim Storey
|
|
|
|
(F) Reprint permit | | | 5/11/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2020 | | DONE |
|
|
|
email permits to hornetsabala@gail.com
|
Plan assigned to (JG) | 2/28/2020 | 2/28/2020 | 3/25/2020 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 03/11 L2 Vista floor upgrade ePlan
|
Routing - PLAN CHECK | 3/25/2020 | | 3/25/2020 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/25/2020 | | DONE |
|
|
|
met Chris Sabala
Need
GC Form
Revised Cert of Value
|
Route to Impact Fee Review | 3/18/2020 | 3/21/2020 | 3/19/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/28/2020 | | 3/18/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 2/28/2020 | | 3/18/2020 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers
|
1st review completed | | | 3/18/2020 | | FAIL |
Javier Guzman
|
|
|
|
Intake Approval | | | 2/27/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 2/26/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• per structural plan sheet S0.0 special inspection is required and a request to provide a completed form 310 that is also stamped, signed and dated by an Idaho licensed engineer was not addressed, also in the following pages of the uploaded 310 form have engineer mark and provide the items needing special inspection.
|
Intake Approval | | | 2/25/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide missing owner signature on the uploaded 304 form
• Provide a Vicinity Map showing location of the property with street names identified
• Provide a Code Analysis/Building Data on front sheet of plans which includes: code year, occupancy group(s), land use zone, construction type, tenant area, fire suppression system
• Provide a completed form 310 that is also stamped, signed and dated by an Idaho licensed engineer. Form 310 can be found at https://www.cityofboise.org/media/3760/final310_special_inspections.pdf
|
Application received | | | 2/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2020 4:09PM
|