Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD20-00650
StatusIssued
Name DEVIN FRIZZELL
Site Address 2905 W OVERLAND RD
Project NameFiber protector T.I.
Customer Number 
ePlanReviewNo
Description
(FIBER PROTECTOR) Permit to remodel an existing office / storage building with minor work some previously completed un-permit and some new on this permit. Work to include: Demo stairway to unpermitted mezzanine in back storage area, construct (2) non-bearing partitions with tempered glass sections in showroom, 2x6 construction breakroom and closet area previous built with out permit needs inspected, mezzanine created previously is not to be used and a cable with sign stating " STORAGE ON MEZZANINE IS PROHIBITED ", electrical work, and finishes. This building is not fire sprinkled. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. If in the future access to or usage of the mezzanine is desired then a separate building permit including structural engineering will be required - applicant was notified of this. MDH FIRE - NOTE: no outdoor flammable liquid storage approved under this permit. Applicant to submit separate permit for outdoor flammable liquid storage at future date.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/5/20208/5/20208/5/2020 PASS
DetailsJim Storey
BLD-Framing/Rough-in3/24/20203/24/20203/24/2020PPASS
DetailsJim Storey
Tony Phone #: ###-####
Issue PAID IN FULL permit  3/11/2020 DONE
Plan Reviewer's activity  3/11/2020 DONE
DetailsBrian McGowan
Spoke with applicant about converting the noncompliant storage into permitted storage. Told him he would need to provide engineering, new floor plans and building analysis showing storage is permited with proper egress requirements.
Submit three copies as a Plan Mod.
Route to Impact Fee Review3/5/20203/8/20203/6/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE3/6/20203/6/20203/6/2020 PASS
DetailsGreg Ruxton
Comments attached to case. Resubmittal address issues. NOTE: no outdoor flammable liquid storage approved under this permit. Applicant to submit separate permit for outdoor flammable liquid storage at future date.
PLANS/APPL TAKEN TO FRONT DESK  3/6/2020 DONE
DetailsMichael Hanson
Case Summary (BLD)  3/6/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/6/2020 DONE
ALL MET
Need
GC Form
Revised Cert of Value
(double check city impact fees is signed off, no change of use)
Print Occupancy Form  3/6/2020 DONE
Plan assigned to (M_H)2/25/2020 3/6/2020 DONE
DetailsMichael Hanson
1st review completed - 03/09 #518 L2 Paper - Cleaning company
Routing - PLAN CHECK2/25/2020 3/5/2020 PASS
DetailsMichael Hanson
1st review completed  3/5/2020 FAIL
DetailsMichael Hanson
Routing - FIRE2/26/20202/25/20203/3/2020 FAIL
DetailsGreg Ruxton
Attached comments to case and emailed applicant.
Routing - Addressing2/26/2020 2/26/2020 PASS
DetailsDoug Chausow
Routing PW Environmental2/26/2020 2/26/2020 PASS
DetailsZach Conde
Routing - PUBLIC WORKS2/25/2020 2/26/2020 PASS
DetailsCandy A. Nichols
NO NEW PLUMBING
Plans ACCEPTED BY PLAN TECH  2/25/2020 DONE
Intake Approval  2/25/2020 PASS
Application received 2/25/2020