BLD-Framing/Rough-in | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Tony Young
|
|
|
ok with video/photo.... call to meet there // suzie Phone #: ###-####
|
BLD-Final | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | NR |
Jim Storey
|
|
|
Dustin *screened* * virtural if needed * Phone #: ###-#### need ele permit and insp.
|
Issue PAID IN FULL permit | | | 7/13/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/20/2020 | 5/20/2020 | 7/9/2020 | | PASS |
Josh Bogle
|
|
|
05/26 remodel, ePlan- leave for Josh
|
Routing - PLAN CHECK | 5/20/2020 | | 7/9/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/9/2020 | | DONE |
|
|
|
MET
|
Intake Approval | | | 5/20/2020 | | PASS |
|
|
|
spoke with josh about the three plans uploaded together 5-19-2020 and he gave the ok to send on through. he will work with them
|
Plans ACCEPTED BY PLAN TECH | | | 5/20/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/20/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/19/2020 | | FAIL |
|
|
|
3rd prescreen: Floor plan is illegible when zoomed in. Please provide an image with a better resolution. Please upload DWG Site Photo, DWG siteplan and SP100 Site Plan in landscape orientation. Be sure to name all drawings exactly the same as the previous drawings so that they version over.
|
Intake Approval | | | 5/15/2020 | | FAIL |
|
|
|
2nd prescreen all plan sheets need to be rotated except engineering
|
Telephone call | | | 5/13/2020 | | DONE |
|
|
|
will be resubmitting additinal information on eplan
|
Intake Approval | | | 5/13/2020 | | FAIL |
|
|
|
please rotate three plan sheet in the correct orientation (readable) and please upload application **originally walk in**
|
Routing Walk-In (Zoning) | 2/27/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Kevin Holmes
|
|
|
|
Routing Walk-In (BLD) | 2/27/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/27/2020 | | 2/27/2020 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 2/27/2020 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/27/2020 | | | |
|
|
|
|