BLD-Framing/Rough-in | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Mike Jordan
|
|
|
Rod *screened* Phone #: ###-####. soffits, hardlids and furred walls for remainder of interior framing ok.
|
BLD-Framing/Rough-in | 7/15/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Mike Jordan
|
|
|
*screened* Partial interior framing at back of house - Rod Phone #: ###-####. Interior steel stud framed walls and hardlids for restrooms and back of house only. ok.
|
BLD-Energy code compliance | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PASS |
Mike Jordan
|
|
|
Screened- Rod Phone #: ###-####
|
BLD-Concrete | 5/14/2020 | 5/15/2020 | 5/15/2020 | P | PASS |
Mike Jordan
|
|
|
Screened- inspection vapor varier and rebar for concrete slab Phone #: ###-####. Reinforcement and vapor barrier for interior slab on grade.
|
BLD-Footing | 5/13/2020 | 5/14/2020 | 5/14/2020 | P | CANC |
Mike Jordan
|
|
|
screened // Rod Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/5/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/5/2020 | | |
|
|
|
|
Routing - Design Review | 4/29/2020 | | 4/29/2020 | | PASS |
Katelyn Menuge
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/29/2020 | | DONE |
|
|
|
ALL MET (JesseR@radixconstruction.com)
NEED
GC FORM
REVISED VALUE
|
Plan assigned to (M_H) | 3/23/2020 | | 4/29/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 04/16 #520 L3 ePlan - Starbucks
|
Route to Impact Fee Review | 4/27/2020 | 4/30/2020 | 4/28/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/27/2020 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 3/23/2020 | | 4/27/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing - FIRE | 3/23/2020 | 3/23/2020 | 4/17/2020 | | PASS |
Greg Ruxton
|
|
|
Attached comments to case.
|
Routing PW Environmental | 3/23/2020 | | 4/10/2020 | | PASS |
Zach Conde
|
|
|
NOE FROM ZACH: Starbucks with a grease interceptor. Passed on ePlan with this comment: "Approved with grease abatement
|
Routing PW Sewer Design | 3/26/2020 | | 4/2/2020 | | PASS |
DeAnn Brown
|
|
|
Sewer connection made under BLD20-00295.
|
Routing PW Drainage | 3/26/2020 | | 4/1/2020 | | PASS |
Jason C. Taylor
|
|
|
Review Completed under BLD20-00295
|
Routing PW Street Lights | 3/26/2020 | | 3/26/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 3/23/2020 | | 3/26/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 3/23/2020 | | 3/25/2020 | | FAIL |
Katelyn Menuge
|
|
|
Need patio furnishings adjusted to allow 5-foot wide path to door.
|
Routing - Erosion and Sediment | 3/23/2020 | | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
ESC20-00144 has been submitted for construction activities.
|
Routing PW Solid Waste | 3/24/2020 | | 3/24/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - MECHANICAL | 3/23/2020 | | 3/24/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/23/2020 | | 3/24/2020 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - Addressing | 3/23/2020 | | 3/23/2020 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 3/20/2020 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/5/2020 | | DONE |
Brian McGowan
|
|
|
Shell Permit is under BLD20-00295
|
Intake Approval | | | 3/5/2020 | | FAIL |
Brian McGowan
|
|
|
Please provide or address the following for your Prescreen to be approved:
1. CDHD letter and Floor Plan for approval.
2. Suez Site flow letter.
3. Letter of Approval from Planning and Zoning.
4. Roof Top Plan for equipment placement. (Engineering may need to be provided from the Shell Building Permit).
5. Wall schedules were provided on A101 but no wall sections.
6. The door schedule needs to include the exterior doors as well. Door size and hardware should be part of the Certificate of Occupancy.
7. I cannot find any details/sections on suspended ceilings. None are on I 1104.
8. Fire rated penetrations, exit signs, emergency lighting and portable fire extinguishers were not shown on G004.
9. Structural calculations are required for the RTU. Was this part of the shell permit?
10. Heating and cooling load calculations are needed for new equipment but not specified where they can be found.
Signage on the building and for the Site must be applied for on a separate permit (engineering may be required).
|
Application received | | | 2/28/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 28 2020 3:00PM
|
Routing - PLANNING | 3/27/2020 | | | | PASS |
|
|
|
Requires DR review. All signs require a seperate sign permit.
|