BLD-Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/12/2020 | 8/12/2020 | 8/12/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.78
|
PubWorks Occupancy Approval | 8/12/2020 | 8/12/2020 | 8/12/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer/landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####
|
BLD-Energy code compliance | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
Dave Hannah
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/5/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 4/6/2020 | 4/6/2020 | 4/6/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/2/2020 | 4/3/2020 | 4/3/2020 | P | NR |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted to and approved by PW...
|
Issue PAID IN FULL permit | | | 3/19/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/11/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 3/3/2020 | 3/3/2020 | 3/11/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 3/11/2020 | | 3/11/2020 | | PASS |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 3/11/2020 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 3/4/2020 | | 3/9/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 3/5/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 3/3/2020 | | 3/5/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Route to Impact Fee Review | 3/3/2020 | 3/6/2020 | 3/4/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/3/2020 | | 3/4/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PUBLIC WORKS | 3/3/2020 | | 3/4/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - FIRE | 3/3/2020 | 3/3/2020 | 3/3/2020 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required. Design meets all of the minimum requriements. No review comments. rovided.
|
Routing - Erosion and Sediment | 3/3/2020 | | 3/3/2020 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/3/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/3/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 3/3/2020 | | 3/3/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/3/2020 | | 3/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 3/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2020 10:12AM
|