OVERRIDE | | | 8/13/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/22/2020 | 6/22/2020 | 8/13/2020 | | PASS |
Josh Bogle
|
|
|
06/26 modification - 1st done
|
Routing - PLAN CHECK | 8/13/2020 | | 8/13/2020 | | PASS |
Josh Bogle
|
|
|
1.5hrs Mod fee
|
Permit Ready to Issue | | | 8/13/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan Reviewer's activity | | | 8/12/2020 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal
|
Routing - PLANNING | 7/28/2020 | | 7/29/2020 | | PASS |
Sue Cummings
|
|
|
Good to go!
|
Routing - PLAN CHECK | 7/28/2020 | | 7/29/2020 | | FAIL |
Josh Bogle
|
|
|
see changemarks in ePlan
|
Plan Reviewer's activity | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLAN CHECK | 7/13/2020 | | 7/13/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 7/10/2020 | | 7/10/2020 | | FAIL |
Sue Cummings
|
|
|
Corrections have not been met
|
Routing - PLAN CHECK | 6/25/2020 | | 6/26/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 6/25/2020 | | 6/25/2020 | | FAIL |
Sue Cummings
|
|
|
driveway need 3 ft. setback
|
Plan Modification Accepted | | | 6/22/2020 | | DONE |
|
|
|
wanted to add a covered patio off of the Living room, so we added a column and had to order additional trusses for the covered patio. We changed an interior wall to a 2x6 wall from a 2x4 wall, and we changed windows. they felt there were too many windows... and so we relocated 1 window and removed 2 others.
|
BLD-Footing | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Jim Storey
|
|
|
screened // Ryan Phone #: ###-####
|
(F) Reprint permit | | | 3/26/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/20/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/4/2020 | 3/4/2020 | 3/20/2020 | | PASS |
Josh Bogle
|
|
|
03/10 addition, ePlan - 1st done
|
Issue PAID IN FULL permit | | | 3/20/2020 | | DONE |
|
|
|
Email permits and inspection card to jraybourn.woodhaven@gmail.com and rycolson@gmail.com
|
Telephone call | | | 3/20/2020 | | DONE |
|
|
|
call the ###-#### and they gave me a ###-#### but couldn't leave message so email Ryan at rycolson@gmail.com to obtain the RP for the erosion permit
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 3/20/2020 | | DONE |
|
|
|
met
NEED
RP
|
Routing - PLAN CHECK | 3/19/2020 | | 3/19/2020 | | PASS |
Josh Bogle
|
|
|
Passed pending heating/cooling info
|
Plan Modification Accepted | | | 3/17/2020 | | FAIL |
Josh Bogle
|
|
|
plans not versioned correctly
|
Plan Modification Accepted | | | 3/12/2020 | | FAIL |
Josh Bogle
|
|
|
plans not versioned correctly
|
Routing - PLAN CHECK | 3/4/2020 | | 3/5/2020 | | FAIL |
Josh Bogle
|
|
|
see email to Ryan
|
Routing - PLANNING | 3/4/2020 | | 3/5/2020 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 3/5/2020 | | FAIL |
Josh Bogle
|
|
|
|
Telephone call | | | 3/4/2020 | | DONE |
|
|
|
went ahead and deleted the blank drawing from Eplan cause the rear elavations are included on the front and back elevation drawing//try calling no answer so email Ryan to ask him about a drawing that came in blank in eplan.
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2020 | | DONE |
|
|
|
no intake fee taken
|
Intake Approval | | | 3/4/2020 | | PASS |
|
|
|
|
Intake Approval | | | 3/3/2020 | | FAIL |
|
|
|
1.Plans must be uploaded as individual files and in the correction orientation in the drawings folder with correct file names. (example A1 Site Plan or Site Plan).
2. Please provide a before and after floor plan. (it looks like the kitchen moved, we need to see where it was located before. Only one kitchen is allowed)
|
Application received | | | 3/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2020 1:54PM
|