BLD-Energy code compliance | 8/11/2020 | 8/11/2020 | 8/12/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Energy code compliance | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Final | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Final | 8/10/2020 | 8/10/2020 | 8/11/2020 | P | CANC |
Tony Young
|
|
|
Hi, could u pls come at the end of day? Energy seal will be going in after lunch. Thank u. Phone #: ###-#### Inspection requested via web by Gerald Cortright// not a final
|
BLD-Framing/Rough-in | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Tony Young
|
|
|
Hi, could u pls come at the end of day? Energy seal will be going in after lunch. Thank u. Phone #: ###-#### Inspection requested via web by Gerald Cortright/// ok to insulate.. needs mech full pass
|
BLD-Framing/Rough-in | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright// conf. only// needs trades// seal pack// fireblocking// special inspections on welds
|
BLD-Framing/Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright// frame walk through,, needs trades,, needs special inspection for welding,, needs straps, shear insp., fire blocking, loads transfer blocking, etc.
|
BLD-Framing/Rough-in | 5/28/2020 | 5/28/2020 | 5/29/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright// walk through,, using SIPS panels
|
BLD-Other | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | CANC |
Brandon Shaw
|
|
|
Plumbing and drainage inspection Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Foundation | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Foundation | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright/// rebar is done,, ok to start forms
|
BLD-Footing | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright
|
BLD-Footing | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright// about 80 % done.. work in progress
|
BLD-Footing | 4/7/2020 | 4/8/2020 | 4/8/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gerald Cortright// work in progress tying bar
|
PubWorks Subgrade Approval | 4/8/2020 | 4/8/2020 | 4/8/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 3/24/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 3/10/2020 | 3/10/2020 | 3/24/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete: 03/20 Failed...03/27 sfd L2 ePlan
|
Issue PAID IN FULL permit | | | 3/24/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/24/2020 | | 3/24/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 3/10/2020 | | 3/20/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
1st review completed | | | 3/20/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLANNING | 3/10/2020 | | 3/19/2020 | | PASS |
Kevin Holmes
|
|
|
Passed per approved CFH permit
|
Routing PW Grading-Hillside | 3/11/2020 | | 3/19/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 3/10/2020 | 3/13/2020 | 3/11/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 3/10/2020 | 3/10/2020 | 3/11/2020 | | PASS |
Lee G Meredith
|
|
|
All measurements are within acceptable limits. Fire sprinklers are not required. No review comments provided.
|
Routing - PUBLIC WORKS | 3/10/2020 | | 3/11/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 3/10/2020 | | 3/11/2020 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 3/10/2020 | | 3/10/2020 | | PASS |
Doug Chausow
|
|
|
|
Telephone call | | | 3/10/2020 | | DONE |
|
|
|
per gerald, deleted detail grading plan. had both grading and erosion under one, he will go in and upload each as their own
|
Intake Approval | | | 3/10/2020 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 3/10/2020 | | 3/10/2020 | | PASS |
Michael Zawacki
|
|
|
SIte prep inspection required.
|
Intake Approval | | | 3/9/2020 | | FAIL |
|
|
|
Need Erosion Plan
|
Application received | | | 3/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2020 3:39PM
|