Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD20-00748
StatusIssued
Name HHS CONSTRUCTION LLC
Site Address 2388 S TRAPPER PL
Project NameHarris North Lot 27 Block 1
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 3234 sq. ft., two story (first story 2373 sq. ft., second story 861 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 305 sq. ft. of covered patio/porch and a 946 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***Sprinklers are not required.***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.**D_S**

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/5/20206/5/20206/5/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other6/2/20206/3/20206/3/2020APASS
DetailsBrandon Shaw
Soffit Inspection Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in6/1/20206/2/20206/2/2020AFAIL
DetailsBrandon Shaw
Provide Engineering approval for 2 1/2" hole bored thru 3 ply, bottom cord, trusses...
See plans - red circles- for columns/bearing points.
Need Mec...
BLD-Wall Bracing5/1/20205/4/20205/4/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation4/8/20204/9/20204/9/2020PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/7/20204/8/20204/8/2020APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/6/20204/7/20204/7/2020PNR
DetailsMike Jordan
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval4/6/20204/6/20204/6/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  3/18/2020  
Issue PAID IN FULL permit  3/18/2020 DONE
Inspection Record Card- Bld  3/18/2020 DONE
Permit Ready to Issue  3/18/2020 DONE
met
Plan assigned to (D_S) Debbie3/16/20203/16/20203/17/2020 DONE
DetailsDebbie Sanine
1st review completed  3/17/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  3/17/2020 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK3/4/2020 3/17/2020 PASS
DetailsRob Patrick
Plan assigned to (RDP)3/4/20203/4/20203/16/2020 DEFR
DetailsRob Patrick
03/23 sfd L2 ePlan
Routing PW Grading-Hillside3/4/2020 3/9/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Route to Impact Fee Review3/4/20203/7/20203/5/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - FIRE3/4/20203/4/20203/5/2020 PASS
DetailsLee G Meredith
New SFH

All measurements are within acceptable limits. Fire sprinklers are not required. No review comments provided.
Routing - MECHANICAL3/4/2020 3/5/2020 PASS
DetailsTroy James
Routing - PLANNING3/4/2020 3/5/2020 PASS
DetailsJeff Lowe
Routing - Addressing3/4/2020 3/4/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/4/2020 3/4/2020 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment3/4/2020 3/4/2020 PASS
DetailsMichael Zawacki
Harris north, no site prep needed
Plans ACCEPTED BY PLAN TECH  3/4/2020 DONE
Recd Pcfee & Taken To Pln CK  3/4/2020 DONE
Intake Approval  3/4/2020 PASS
Application received  3/3/2020 DONE
Application submitted via PDS Online on Mar 3 2020 7:21AM