BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Brandon Shaw
|
|
|
Picture/Video inspection done due to COVID-19...
|
BLD-Wall cover | 4/23/2020 | 4/24/2020 | 4/24/2020 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD-Framing/Rough-in | 4/22/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Brandon Shaw
|
|
|
Video inspection done due to COVID-19... OK to insulate...
|
BLD-Foundation | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Brandon Shaw
|
|
|
greg Phone #: ###-####
|
BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Tell Riley
|
|
|
WIP//per plans on rebar//
|
BLD-Footing | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | DEFR |
Mike Jordan
|
|
|
greg Phone #: ###-####. Moved to pm inspection.
|
PubWorks Subgrade Approval | 3/26/2020 | 3/26/2020 | 3/26/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####
|
Issue PAID IN FULL permit | | | 3/20/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/19/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/5/2020 | 3/5/2020 | 3/18/2020 | | PASS |
Josh Bogle
|
|
|
03/11 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 3/18/2020 | | 3/18/2020 | | PASS |
Josh Bogle
|
|
|
Pass, pending Planning approval
|
Routing - PLANNING | 3/18/2020 | | 3/18/2020 | | PASS |
Crystal Rain
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Routing - PLANNING | 3/13/2020 | | 3/13/2020 | | FAIL |
Sue Cummings
|
|
|
Still doesn't have scaled site plan nor floor plan of the house
|
Routing - PLAN CHECK | 3/13/2020 | | 3/13/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
1st review completed | | | 3/10/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 3/5/2020 | | 3/9/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 3/5/2020 | | 3/6/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 3/5/2020 | | 3/5/2020 | | FAIL |
Sue Cummings
|
|
|
Need a full floor plan of the house, a site plan drwn to scale. The side setback is 10 ft. unless there are no exterior change to footprint. Which is why we need site plan to scale.
|
Routing - PUBLIC WORKS | 3/5/2020 | | 3/5/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 3/5/2020 | | 3/5/2020 | | PASS |
Michael Zawacki
|
|
|
No esc needed, addition is 112sf
|
Intake Approval | | | 3/5/2020 | | PASS |
|
|
|
|
Application received | | | 3/3/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2020 4:49PM
|