Permit Information
Permit NumberBLD20-00781
StatusFinaled
Name A & J MFG
Site Address 700 N ROBBINS RD
Project NameRoof Access Ladder
Customer Number 
ePlanReviewNo
Description
(ROOF LADDER TO ACCESS MECHANICAL EQUIPMENT – FORT BOISE COMMUNITY CENTER) The fire sprinkler system is used for building area increase. To fabricate and install an exterior vertical roof ladder to access mechanical equipment. The ladder will be installed on the exterior side of a wall between a lower roof and a higher roof. The lower roof is accessed via an existing interior ladder through a roof hatch. Work is to include steel side rails that extend above the parapet, steel rungs, steel mounting straps, and Titen anchors post installed in existing masonry. Special Inspection is required for anchors post installed in masonry. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. This is a scope of work permit only. This permit does not establish a Certificate of Occupancy for any portion of this building. Existing occupancy approvals are still valid. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/13/2020 DONE
Drawings taken to Records
BLD-Final4/6/20204/7/20204/7/2020APASS
DetailsDave Hannah
screened // rick Phone #: ###-####
DOC - Permit Finaled4/7/20204/7/20204/7/2020PPASS
DetailsDave Hannah
Route to Impact Fee Review3/11/20203/14/20203/12/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Permit Ready to Issue  3/12/2020 DONE
NEED
GC
MET
VALUE (patrick is gc)
Inspection Record Card- Bld  3/12/2020 DONE
Issue PAID IN FULL permit  3/12/2020 DONE
Plan assigned to (CJW)3/4/20203/4/20203/11/2020 PASS
DetailsCarl Westfall
ladder - have done by Tuesday (3-10-20)
Routing - PLAN CHECK3/4/2020 3/11/2020 PASS
DetailsCarl Westfall
1st review completed  3/11/2020 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/11/2020 DONE
Plans ACCEPTED BY PLAN TECH  3/4/2020 DONE
Intake Approval  3/4/2020 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  3/4/2020 DONE
Application received 3/4/2020