Permit Information
Permit NumberBLD20-00791
StatusIssued
Name QUALITY ELECTRIC INC
Site Address 150 N CAPITOL BLVD
Project NameCity Hall - Generator Replaced
Customer Number 
ePlanReviewNo
Description
(CITY HALL – BASEMENT - GENERATOR REPLACEMENT) Permit is for the replacement of an existing generator in the basement with a new generator and a new 50-gallon double-wall day fuel tank. (Note: The existing 500-gallon tank that was originally installed shall remain). Approval is contingent upon adhering to the approved plans on file. Work to include: removal of existing generator, addition of new generator, new 50-gallon double-wall day fuel tank, new vent piping, electrical work and mechanical work. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20205/21/20205/21/2020APASS
DetailsDave Hannah
Greg *screened* Phone #: ###-####
FIRE-Final Inspection5/20/20205/20/20205/20/2020PPASS
DetailsJim Page
Generator power transfer was witnessed and verified by a city of boise employee, final life fire safety inspection for scope of work is complete.

Greg Phone #: ###-####
BLD-Final5/11/20205/12/20205/12/2020APEND
DetailsDave Hannah
Please call for access, requests after 9 - Greg Phone #: ###-####
(F) Reprint permit  3/31/2020 DONE
Inspection Record Card- Bld  3/31/2020 DONE
Issue PAID IN FULL permit  3/30/2020 DONE
Plan assigned to (JG)3/5/20203/5/20203/25/2020 PASS
DetailsJavier Guzman
03/18 L2 Generator Replacement Paper Plans
Routing - PLAN CHECK3/5/2020 3/25/2020 PASS
DetailsJavier Guzman
Case Summary (BLD)  3/25/2020 DONE
DetailsJavier Guzman
1st review completed  3/25/2020 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/25/2020 DONE
Permit Ready to Issue  3/25/2020 DONE
Routing - FIRE3/6/20203/5/20203/24/2020 PASS
DetailsJoe Bruce
Printed out case summary and attached to plans. Added notes for PDS Fire Inspector on the plans.
Routing - Addressing3/6/2020 3/6/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/5/2020 3/6/2020 PASS
DetailsCandy A. Nichols
NO NEW PLUMBING
Intake Approval  3/5/2020 PASS
Application received 3/5/2020   
Routing - Design Review3/25/2020   PASS
DetailsKatelyn Menuge
Paint pipe to blend with tones of adajcent wall.