BLD-Framing/Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Brandon Shaw
|
|
|
screened // Angela Phone #: ###-####
|
BLD-Energy code compliance | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | NR |
Jim Storey
|
|
|
screened // Angela Phone #: ###-####
|
BLD-Conference | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | DONE |
Brandon Shaw
|
|
|
screened // angela Phone #: ###-####
|
Routing Walk-In (Zoning) | 3/9/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Crystal Rain
|
|
|
|
Routing Walk-In (BLD) | 3/9/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Plan assigned to (JAB) Josh | 3/9/2020 | 3/9/2020 | 3/9/2020 | | PASS |
Josh Bogle
|
|
|
03/13 kitchen, paper
|
Routing PW Flood Plain | 3/9/2020 | | 3/9/2020 | | CANC |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 3/9/2020 | | 3/9/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/9/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/9/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 3/9/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2020 | | DONE |
|
|
|
Called and spoke with Angela to let her know her permit is ready for pickup and the fees due.
|
Issue PAID IN FULL permit | | | 3/9/2020 | | DONE |
|
|
|
|
Application received | | 3/9/2020 | | | |
|
|
|
|