Permit Information
Permit NumberBLD20-00828
StatusFinaled
Name JAY RALPHS CONSTRUCTION LLC
Site Address 4356 N ARROW CREST WAY
Project NameSchulte addition
Customer Number 
ePlanReviewNo
Description
Permit to add 70sq' under the existing roof-line to convert Pantry to a Formal Dining space. All work per plans, notations, engineering, local codes & ordinances. Separate electrical permit required. **JAB** If new footings: A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20205/1/20205/1/2020APASS
DetailsTony Young
Jay Phone #: ###-####,, owner to finish flooring, trim etc.
DOC - Permit Finaled5/1/20205/1/20205/1/2020PPASS
DetailsTony Young
BLD-Energy code compliance4/15/20204/16/20204/16/2020APASS
DetailsTony Young
video/photo ok // Jay Phone #: ###-####
BLD-Framing/Rough-in4/13/20204/15/20204/15/2020PPASS
DetailsTony Young
video/photo ok // Jay Phone #: ###-####
BLD-Footing3/18/20203/19/20203/19/2020APASS
DetailsTell Riley
Jay Phone #: ###-####//meets minimums on plans//
BLD-Footing3/17/20203/18/20203/18/2020PFAIL
DetailsJim Storey
Jay Phone #: ###-#### no pw sign off no insp.
PubWorks Subgrade Approval3/18/20203/18/20203/18/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  3/11/2020 DONE
Plan assigned to (JAB) Josh3/9/20203/9/20203/10/2020 PASS
DetailsJosh Bogle
03/13 addition, paper
Routing - PUBLIC WORKS3/10/2020 3/10/2020 PASS
DetailsMorgan Webb
1st review completed  3/10/2020 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/10/2020 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/10/2020 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/10/2020 DONE
DetailsJosh Bogle
ESC no - Energy yes
Permit Ready to Issue  3/10/2020 DONE
met
Telephone call  3/10/2020 DONE
Spoke with Jay informing him this is ready and the fee amount due
Routing - PLAN CHECK3/9/2020 3/10/2020 PASS
DetailsJosh Bogle
Routing Walk-In (BLD)3/9/20203/9/20203/9/2020APASS
DetailsJosh Bogle
took in for level two review
Routing PW Grading-Hillside3/9/2020 3/9/2020 PASS
DetailsMelissa Jannusch
If new footings: A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Routing - PLANNING3/9/2020 3/9/2020 PASS
DetailsSue Cummings
Application received 3/9/2020