BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Tony Young
|
|
|
screened // Andy Phone #: ###-####,, carport ok
|
BLD-Energy code compliance | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PART |
Tony Young
|
|
|
Screened- Andy Phone #: ###-####//house part ok,, seal all holes.. ok to insulate house
|
BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Tony Young
|
|
|
shear.. access in the backyard screened // Andy Phone #: ###-####
|
OVERRIDE | | | 4/6/2020 | | |
|
|
|
|
BLD-Footing | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PART |
Tell Riley
|
|
|
concrete @2 // Andy Phone #: ###-####//setbacks on eastside appear to be ok per drawings//need to locate pins on west side for piers, and check wall setbacks when pins located prior to going vertical//
|
Routing Walk-In (BLD) | 3/16/2020 | 3/16/2020 | 3/16/2020 | A | DONE |
Josh Bogle
|
|
|
bringing in additional plans and engineering
|
Plan assigned to (JAB) Josh | 3/9/2020 | 3/9/2020 | 3/16/2020 | | PASS |
Josh Bogle
|
|
|
03/13 additions, paper - 1st done
|
Routing - PLAN CHECK | 3/16/2020 | | 3/16/2020 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Issue PAID IN FULL permit | | | 3/16/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/16/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/9/2020 | | 3/13/2020 | | FAIL |
Josh Bogle
|
|
|
needs engineering calcs, section view, as-builts, etc,
|
Routing - MECHANICAL | 3/11/2020 | | 3/11/2020 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/11/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 3/9/2020 | | 3/10/2020 | | FAIL |
Troy James
|
|
|
Emailed corrections to western htg
|
Routing Walk-In (Zoning) | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Application received | | 3/9/2020 | | | |
|
|
|
|