Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD20-00846
StatusIssued
Name LEVEL CONSTRUCTION LLC
Site Address 2901 W NEFF ST
Project NameBelt Addition
Customer Number 
ePlanReviewNo
Description
Permit to build a 459sq' 2bd/1bth addition, convert a 286sq' garage to Family Room living space, and build 504sq' attached carport. Heating/cooling of addition via new GFA furnace - Energy Code via alt-Prescriptive. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/8/20206/8/20206/8/2020PPASS
DetailsTony Young
screened // Andy Phone #: ###-####,, carport ok
BLD-Energy code compliance6/2/20206/3/20206/3/2020APASS
DetailsTony Young
Andy Phone #: ###-####
BLD-Framing/Rough-in5/29/20205/29/20205/29/2020PPART
DetailsTony Young
Screened- Andy Phone #: ###-####//house part ok,, seal all holes.. ok to insulate house
BLD-Wall Bracing4/13/20204/13/20204/13/2020PPASS
DetailsTony Young
shear.. access in the backyard screened // Andy Phone #: ###-####
OVERRIDE  4/6/2020  
BLD-Footing3/20/20203/23/20203/23/2020PPART
DetailsTell Riley
concrete @2 // Andy Phone #: ###-####//setbacks on eastside appear to be ok per drawings//need to locate pins on west side for piers, and check wall setbacks when pins located prior to going vertical//
Routing Walk-In (BLD)3/16/20203/16/20203/16/2020ADONE
DetailsJosh Bogle
bringing in additional plans and engineering
Plan assigned to (JAB) Josh3/9/20203/9/20203/16/2020 PASS
DetailsJosh Bogle
03/13 additions, paper - 1st done
Routing - PLAN CHECK3/16/2020 3/16/2020 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  3/16/2020 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/16/2020 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/16/2020 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Issue PAID IN FULL permit  3/16/2020 DONE
Permit Ready to Issue  3/16/2020 DONE
Routing Walk-In (BLD)3/13/20203/13/20203/13/2020PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK3/9/2020 3/13/2020 FAIL
DetailsJosh Bogle
needs engineering calcs, section view, as-builts, etc,
Routing - MECHANICAL3/11/2020 3/11/2020 PASS
DetailsTroy James
1st review completed  3/11/2020 FAIL
DetailsJosh Bogle
Routing - MECHANICAL3/9/2020 3/10/2020 FAIL
DetailsTroy James
Emailed corrections to western htg
Routing Walk-In (Zoning)3/9/20203/9/20203/9/2020PDONE
DetailsSue Cummings
Routing Walk-In (BLD)3/9/20203/9/20203/9/2020PPASS
DetailsJosh Bogle
took in for level two review
Application received 3/9/2020