BLD-Wall Bracing | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Foundation | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PART |
Brandon Shaw
|
|
|
Columns to be poured at a later date...
|
PubWorks Subgrade Approval | 5/4/2020 | 5/4/2020 | 5/4/2020 | | DONE |
Melissa Jannusch
|
|
|
***Excluding 3 isolated pads for the patio cover***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 4/20/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/15/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Brandon Shaw
|
|
|
Basement footings... Work in progress...
|
PubWorks Subgrade Approval | 4/15/2020 | 4/15/2020 | 4/15/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears Inspection cancelled from web by: Ben Sears
|
OVERRIDE | | | 4/7/2020 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/7/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/7/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/7/2020 | | DONE |
|
|
|
|
Plan assigned to (D_S) Debbie | 3/19/2020 | 3/19/2020 | 4/6/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing PW Grading-Hillside | 4/6/2020 | | 4/6/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 3/30/2020 | | 3/30/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing PW Grading-Hillside | 3/20/2020 | | 3/30/2020 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLAN CHECK | 3/19/2020 | | 3/26/2020 | | PASS |
Debbie Sanine
|
|
|
|
Routing - FIRE | 3/19/2020 | 3/19/2020 | 3/25/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required. All measurements are within acceptable limits.
|
Routing - Erosion and Sediment | 3/19/2020 | | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
Route to Impact Fee Review | 3/19/2020 | 3/22/2020 | 3/20/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 3/19/2020 | | 3/20/2020 | | PASS |
Rita DeYoung
|
|
|
|
Routing - MECHANICAL | 3/19/2020 | | 3/20/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 3/19/2020 | | 3/20/2020 | | FAIL |
Crystal Rain
|
|
|
Post for patio cover and concrete encroach into the platted property storm drainage easement. Also, Note 8 of the Privada Estates Plat says “Vehicle access to lots 1, 2, 6, & 7 of Block 1, shall be provided from shared driveways and a perpetual ingress/egress easement as shown on this plat (sheet 3) for the benefit of lots 1, 2, 6, & 7 of Block 1.” Site plan does not clearly indicate compliance. Please verify the location and dimensions of shared driveway on Lot 6.
|
Routing - Addressing | 3/19/2020 | | 3/19/2020 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/19/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2020 | | DONE |
|
|
|
|
1st review completed | | | 3/19/2020 | | DONE |
Debbie Sanine
|
|
|
|
Intake Approval | | | 3/12/2020 | | FAIL |
|
|
|
Please provide a copy of the manual J.
|
Application received | | | 3/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2020 1:01PM
|