BLD-Energy code compliance | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | FAIL |
Brandon Shaw
|
|
|
Insulation installedproir toframing inspection... cannot verifyheaders/beams through out exterior walls... See pg S1.1- tall wall notes, stud spacing and CS straping/ with blocking... See pg S1.1 detail #2 for shear wall transfer and red marks pg S3.0 for location...
|
BLD-Other | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | PART |
Tell Riley
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell //WIP//
|
BLD-Footing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 4/9/2020 | 4/9/2020 | 4/9/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/3/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/25/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 3/13/2020 | 3/13/2020 | 3/25/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 3/25/2020 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 3/13/2020 | | 3/25/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Erosion and Sediment | 3/13/2020 | | 3/17/2020 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Harris North home, subdivision BMPs in place
|
Route to Impact Fee Review | 3/13/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 3/13/2020 | | 3/16/2020 | | PASS |
Debbie Sanine
|
|
|
|
Routing - MECHANICAL | 3/13/2020 | | 3/16/2020 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/16/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - FIRE | 3/13/2020 | 3/13/2020 | 3/13/2020 | | PASS |
Lee G Meredith
|
|
|
Builder has noted on the cover sheet hat fire sprinklers are required. No review comments provided.
|
Routing - PLANNING | 3/13/2020 | | 3/13/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/13/2020 | | 3/13/2020 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/13/2020 | | 3/13/2020 | | PASS |
Candy A. Nichols
|
|
|
0056
|
Plans ACCEPTED BY PLAN TECH | | | 3/13/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/13/2020 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/13/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/11/2020 | | FAIL |
|
|
|
NEED
plan in documents put into drawings
met
(per tisha we can accept esc as 11x17) Erosion plans wrong size
|
Application received | | | 3/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2020 4:05PM
|