BLD-Framing/Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | PASS |
Tony Young
|
|
|
Kent *screened* Phone #: ###-####
|
BLD-Footing | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | PASS |
Tony Young
|
|
|
screened - rebar - Kent Phone #: ###-####
|
PubWorks Subgrade Approval | 6/4/2020 | 6/4/2020 | 6/4/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/23/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/9/2020 | 4/9/2020 | 4/17/2020 | | PASS |
Josh Bogle
|
|
|
04/15 patio cover, ePlan - 1st done
|
Routing - PLAN CHECK | 4/17/2020 | | 4/17/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 4/17/2020 | | DONE |
|
|
|
met
|
1st review completed | | | 4/10/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/9/2020 | | 4/10/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing - PLANNING | 4/9/2020 | | 4/9/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 4/9/2020 | | 4/9/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing PW Grading-Hillside | 4/9/2020 | | 4/9/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2020 | | |
|
|
|
|
Intake Approval | | | 4/8/2020 | | FAIL |
|
|
|
2nd prescreen- Please upload the drawings from the engineer to drawings in a separate files. I went ahead and deleted the packet from documents.
|
Meeting | | | 4/3/2020 | | DONE |
|
|
|
CAT I hillside permit can be accepted for building permit review. MMJ// this note was on the Eplan from Melissa. FAIL our prescreen so i removed so the applicant will not get confused.
|
Intake Approval | | | 4/3/2020 | | FAIL |
|
|
|
1st Prescreen-
1. Plans need to be individual
2. Files names correctly.
3. Site plans was cut off, need one that shows the whole property lines.
4. Application needed- None was uploaded
Drawings were deleted
|
Routing Walk-In (Zoning) | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | FAIL |
Jeff Lowe
|
|
|
needs to run things through PW Hillside first.
|
Application received | | 3/11/2020 | | | |
|
|
|
|