BLD-Footing | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Brandon Shaw
|
|
|
Rebar inspection on swimming pool. Phone #: ###-#### Inspection requested via web by Mark Wright
|
BLD-Footing | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | FAIL |
Jim Storey
|
|
|
Rebar inspection on swimming pool Phone #: ###-#### Inspection requested via web by Mark Wright A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
PubWorks Subgrade Approval | 4/16/2020 | 4/16/2020 | 4/16/2020 | | DONE |
Melissa Jannusch
|
|
|
Pool House and pool bottom: A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
Plan assigned to (JAB) Josh | 3/12/2020 | 3/12/2020 | 3/17/2020 | | PASS |
Josh Bogle
|
|
|
03/18 pool, paper
|
Routing - PLAN CHECK | 3/12/2020 | | 3/17/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/17/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/17/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
MET
|
Issue PAID IN FULL permit | | | 3/17/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/16/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Josh Bogle
|
|
|
bringing in additional information
|
Routing PW Grading-Hillside | 3/16/2020 | | 3/16/2020 | | PASS |
Melissa Jannusch
|
|
|
POOL ONLY
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing PW Grading-Hillside | 3/12/2020 | | 3/13/2020 | | FAIL |
Melissa Jannusch
|
|
|
Prior to the approval of BLD20-00893 the following revisions are requested:
1. 2 copies of the geotechnical engineering report and any relevant addendums.
2. 1 additional copy of the grading and drainage plan
3. 2 copies of the CFH approval letter from P&Z
|
Routing - Erosion and Sediment | 3/12/2020 | | 3/13/2020 | | PASS |
Andy J. Long
|
|
|
request pool to be under ESC20-00120, issued with BLD permit for associated pool house. Request Approved
|
Routing Walk-In (Zoning) | 3/12/2020 | 3/12/2020 | 3/12/2020 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/12/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two revview
|
Application received | | 3/12/2020 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/13/2020 | | | | FAIL |
Morgan Webb
|
|
|
SEE HILLSIDE FOR FAIL
|