BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | NR |
Brandon Shaw
|
|
|
I have information from ABCO I can email over to you Phone #: ###-#### Inspection requested via web by Cassandra Hessing
|
Permit Ready to Issue | | | 5/29/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
CHANGE STATUS TO (ISS) | | | 5/29/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/8/2020 | 5/8/2020 | 5/28/2020 | | PASS |
Josh Bogle
|
|
|
Plan mod
|
Routing - PLAN CHECK | 5/28/2020 | | 5/28/2020 | | PASS |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 5/8/2020 | | DONE |
|
|
|
We have started the above project. We had some changes that needed to be made on the engineered drawings. We changed piers 1-7 from push to helical.
|
Permit Ready to Issue | | | 3/30/2020 | | DONE |
|
|
|
//ESC NOT NEEDED PER JOSH
MET
NEED RP
|
Issue PAID IN FULL permit | | | 3/30/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/18/2020 | 3/18/2020 | 3/27/2020 | | PASS |
Josh Bogle
|
|
|
03/24 helical piers, ePlan - 1st done
|
Routing - PLAN CHECK | 3/27/2020 | | 3/27/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 3/18/2020 | | 3/23/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing - PLANNING | 3/18/2020 | | 3/23/2020 | | PASS |
Jeff Lowe
|
|
|
this ismaintenance/repair and will not require any other HP approvals
|
1st review completed | | | 3/23/2020 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 3/18/2020 | | PASS |
|
|
|
|
Application received | | | 3/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2020 10:56AM
|